<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />be raised 10 feet. The estimated cost including final design, construction, <br />and construction management is $1,800,000. <br /> <br />Alternative 3 <br />This alternative is identical to Alternative 2, except that it only increases <br />reservoir storage by 2400 acre-feet. The auxiliary spillway channel would be <br />150 feet wide; the dam would be raised 10 feet; and the principal spillway <br />ogee weir would be raised five feet. The estimated cost including final <br />design, construction, and construction management is $1,284,000. <br /> <br />- 43 - <br />