My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00170
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:10 AM
Creation date
10/5/2006 11:41:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153481
Contractor Name
Colorado River Water Conservation District
Water District
0
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I I <br /> <br />i <br /> <br />I <br /> <br />3.0 PREVIOUS STUDIES <br /> <br />The following is a chronological list of reports from previous investigations <br />which pertain to this feasibility study: <br /> <br />o Geology, Materials Investigation, and Embankment Design, Elkhead <br />Creek Hi gh Dam; Engi neeri ng Consul tants, I nc.; 1973. <br /> <br />o Drawi ngs and Specifi cati ons for the Construc ti on of E1 khead Lake <br />Dam; Engineering Consultants, Inc.; 1973. <br /> <br />o Craig Area Facilities Plan for Wastewater Treatment; Norton, <br />Underwood, and Lamb Engineering Associates; August, 1978. <br /> <br />o <br /> <br />Prel il11i nary Report for Water <br />Colorado; Norto~, Underwood, and <br />1979. <br /> <br />Syste'11 Improvements for Cra i g, <br />Lamb Engineering Associates; July, <br /> <br />o Hydrologic Analysis of Elkhead Reservoir; Colorado Division of <br />Wil dl ife; 1984. <br /> <br />o El khead Lake Dam: Feasi bil i ty of Expandi ng Spi 11 way Capac ity wi th <br />RCC Overflow Se:tion; Morrison-Knudsen Engineers, Inc.; July, 1985. <br /> <br />o Pre 1 imi na ry Report on Downtown Water System Improvements, Ci ty of <br />Craig, Colorado; Norton, Underwood, and Lamb, Inc.; February, 1986. <br /> <br />o Elkhead Lake Dam Modifications - Final Design Report; i~orrison- <br />Knudsen Engineers, Inc.; 1986. <br /> <br />o Specifi cati ons for El khead Lake Dam Modifi cati ons; r~orri son- <br />Knudsen Engineers, Inc.; 1985. <br /> <br />o Drawings for Elkhead Lake Dam Modifications; Morrison-Knudsen <br />Engineers, Inc.; 1986. <br /> <br />- 5 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.