My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00166
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:10 AM
Creation date
10/5/2006 11:41:20 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153311
Contractor Name
Nunn, Town of
Contract Type
Loan
Water District
0
County
Weld
Bill Number
SB 78-69
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE II 1-2 <br />CURRENT AND FUTURE WATER DEMANDS <br /> <br />NUNN, COLORADO <br /> <br /> CURRENT FUTURE (Year 2000) <br /> Consumptive Use Demand Consumptive Use Demand <br /> Rate (mg/yea r) Rate (mg/year) <br />Metered 18,918 27.18 <br />Unmetered 1. 052** 1.70 <br />Park Watering 0.630*** 0,63 <br />TOTALS 188 gpcd* 20.600 188 gpcd 29.51 <br /> (56,500 gpd) (80,850 gpd) <br /> <br />Max. Daily 470 gpcd 470 gpcd <br />(2.5 avg, daily) (98 gpm) (140 gpm) <br /> (141,000 gpd) (202,100 gpd) <br />Max Hourly 800 gpcd 800 gpcd <br />(4,25 avg daily) (167 gpm) (239 9pm) <br /> <br />* Average daily per capita use based on current population of 300, <br />** Estimated 16 taps for homes, post office, church and Town Hall, <br />*** Estimated irrigation season 20 weeks, 1.0 inches per week. <br />
The URL can be used to link to this page
Your browser does not support the video tag.