My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00162
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:52 AM
Creation date
10/5/2006 11:41:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153711
Contractor Name
Castle Pines North Metro District
Contract Type
Loan
Water District
8
County
Douglas
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />See Table 5. <br /> <br />E. <br /> <br />Schedule of Water Fund Revenues and Exnenditures by Year for Period of CWCB <br /> <br />Debt Retirement <br /> <br />See Table 5. <br /> <br />F. <br /> <br />Financial Impact of the Proiect on Total Debt and on Rates and Assessments <br /> <br /> <br />There currently is no debt secured directly by the water and sewer enterprise funds. <br /> <br /> <br />The new CWCB loan will increase the debt by $301,500 and be the only debt of that <br /> <br /> <br />fund. There is no property tax pledge to the CWCB loan and no impact on rates <br /> <br /> <br />expected. There currently are no assessments levied by the District. <br /> <br />G. <br /> <br />Contracts, Court Actions. Permits. and Agreements Related to Proiect <br /> <br />Imnlementation <br />The District has adjudicated the necessary water rights for the Project and obtained <br /> <br /> <br />the necessary permits from the Office of the State Engineer. Contracts for the work <br /> <br /> <br />to be performed in relation to the Project will be awarded after a competitive <br /> <br /> <br />bidding process as required by applicable state statutes. The District will require the <br /> <br /> <br />selected contractor to enter into a written construction contract which will include <br /> <br /> <br />the performance guarantees and payment and material bonds required by applicable <br />statutes. <br /> <br />20 <br /> <br />Jehn Water Consultants. Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.