Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />attached in Appendix C) was to lower the pumping units in Wells A-I and A-2 along <br /> <br /> <br />with replacing the pumping unit in Well A-3. The pumping unit in A-3 was out of <br /> <br /> <br />service and had to be replaced in any regard. Additionally, the age and wear of the <br /> <br /> <br />other two pumping units indicated that they would need replacement in 1995 or 1996 <br /> <br /> <br />also, which suggested that this short term solution was not viable. The solution <br /> <br /> <br />chosen (Alternative 3 below) was to replace the pumping units with larger units at <br /> <br /> <br />deeper settings to allow the production of 1500 gpm from the three wells combined. <br /> <br /> Alternatives Considered: <br />Alternative Cost Estimate Flow <br /> (gpm) <br />1 Repair pump unit in Well A-3 $166,638 500 Completed <br /> Continue to use A-I and A-2 $150,000? 600 minimum <br /> (Will need repair in 1995 or 1996) replacement <br /> Add 2 Denver aquifer wells $700,000 500 <br /> Total $1,016,638 1600 <br />2 Repair pump unit in Well A-3 $166,638 500 Completed <br /> Continue to use A-I and A-2 $150,000? 600 minimum <br /> (Will need repair in 1995 or 1996) replacement <br /> Drill additional Arapahoe Well $750,000 500 <br /> Total $1,066,638 1600 <br />3 Repair pump unit in Well A-3 $166,638 500 Completed <br /> Replace pumping units in A-I, A-2 $394,485 1000 <br /> Total $561,123 1500 <br /> <br />C. <br /> <br />Preliminary Deshm and Layout <br /> <br />The project has been designed in two separate Phases, relating to the proposed <br /> <br />upgrades for the three wells. Well A-3 (Phase 1) has been completed as of this <br /> <br />report writing under an emergency loan by the CWCB. Final design, therefore has <br /> <br />15 <br /> <br />Jehn Water Consultants. Inc. <br />