My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00159
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:09 AM
Creation date
10/5/2006 11:41:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153305
Contractor Name
Dolores Water Conservancy District
Water District
0
County
Dolores
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CHAPTER VI <br /> <br />CHAPTER VII <br />REFERENCES . <br /> <br />I <br /> <br />TABLE OF CONTENTS (CaN'T) <br /> <br />Dove Creek <br /> <br />, <br /> <br />Dolores, . <br />Montezuma Water Company, <br />Montezuma Water District No. 1 <br />Towaoc . . . <br /> <br />. <br /> <br />Summit Ridge <br /> <br /> <br />Treatment Plant Alternatives. . , <br /> <br /> <br />Dolores Site - Central Treatment Plant (Alt. No.1). <br /> <br /> <br />Rim Site - Central Treatment Plant (Alt. No, 2). <br /> <br /> <br />Rim Site With Cahone Satellite Plant (Alt. No.3). <br /> <br /> <br />Expansion of Existing Dove Creek Plant (Alt. No.4). , <br /> <br /> <br />Transmission Line/Pumping Alternatives. . , <br /> <br /> <br />Cortez-Towaoc Pipeline <br /> <br /> <br />Northern Pipeline. <br /> <br /> <br />Cost Comparisons. . . . . <br /> <br /> <br />Recommended Alternative. . <br /> <br /> <br />Construction Staging of Recommended Alternatives. <br /> <br />. <br /> <br />. <br /> <br />B. Design. . . . . . . <br /> <br />Treatment Plants <br />Water Transmission Design Guidelines <br />Pumping Station Design <br />Construction Material. <br /> <br />. . <br /> <br />C. Right-Of-Way. <br /> <br />. . . . . <br /> <br />D. Operation and Management. .... . <br />E. Project Impact On Future Population Distribution. <br />ESTIMATED COSTS . . . , .. <br /> <br />A. Construction Costs. <br /> <br />, <br /> <br />. <br /> <br />Capital Costs Summary. . . <br /> <br /> <br />B. Operation and Maintenance Costs . <br /> <br /> <br />Operation and Maintenance Costs Summary. <br /> <br /> <br />FINANCIAL PROGRAM , <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. . . . . . . . . . <br /> <br />. <br /> <br />PAGE <br /> <br />. <br /> <br />42 <br />42 <br />44 <br />44 <br />47 <br />47 <br />50 <br />50 <br />52 <br />54 <br />56 <br />57 <br />57 <br />57 <br />58 <br />60 <br />62 <br />62 <br />62 <br />68 <br />68 <br />69 <br />69 <br />69 <br />70 <br />74 <br />74 <br />75 <br />79 <br />79 <br />81 <br />89 <br /> <br />, <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. . <br /> <br />. <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.