Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br /> <br />treated water from the district. At the time of this writing, the town of Dolores <br /> <br /> <br />has indicated it wishes to maintain its own private water supply system. However, <br /> <br /> <br />it wants the future option of being included in the Dolores Water Conservancy <br /> <br /> <br />District water treatment program. The anticipated population to be served in <br /> <br /> <br />Dolores has been included in the projections, and is approximately 6% of the total <br /> <br /> <br />for the district. <br /> <br />Since the planning horizon for this study is set at 20 years, all the population <br /> <br /> <br />projections have been carried out to the year 2004. Actual population counts <br /> <br /> <br />throughout the project period should of course be tabulated and compared with these <br /> <br /> <br />projections so that, by simple linear extension of the actual population figures, <br /> <br /> <br />planning can be conducted for the years beyond 2004. Again it should be emphasized <br /> <br /> <br />that, while it is essential for the purposes of this study to establish estimated <br /> <br /> <br />expansion stages by date for the treatment plant, in actual practice the expansion <br /> <br /> <br />stages of the main treatment plant will be triggered by actual population growth. <br /> <br /> <br />The stages of construction might therefore be moved forward or backward from the <br /> <br /> <br />estimated dates in this study. Deviations from the original plan will necessitate <br /> <br /> <br />periodic updating of the financial program. <br /> <br />The final projections upon which preliminary designs were based are listed in <br /> <br /> <br />Table 4-4. Figure 4-2 shows the location of the different divisions within the <br /> <br /> <br />two-county area. <br /> <br />-18- <br /> <br />-,' <br />