My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00158
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 1:47:52 PM
Creation date
10/5/2006 11:41:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150098
Contractor Name
Lake Henry Reservoir Company
Contract Type
Loan
Water District
17
County
Crowley
Bill Number
HB 02-1152
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />THE LAKE HENRY RESERVOIR COMPANY <br />331 MAIN STREET - - PO BOX 8 <br />ORDWAY, COLORADO 81063-0008 <br />Phone (719) 267-4411 <br />Fax (719) 267-4074 <br /> <br />August 27,2001 <br /> <br />RECEIVED <br />AUG ~ 9 2001 <br /> <br />Mr. John W. Van Sciver <br />The Colorado Water Conservation Board <br />1313 Sherman St., Room 721 <br />Denver, Colorado 80203 <br /> <br />CoIotado Water Conservallon Board <br /> <br />Dear Mr. Van Sciver: <br /> <br />The Company is looking for a loan to cover construction and engineering for the <br />installation of a spillway and toe drain at Lake Henry Reservoir. On the enclosed <br />application we have asked for a twenty-year loan, upon later consideration we may <br />request that be changed to thirty years_ <br /> <br />I have also enclosed the following: <br />1. Letter from the First National Bank of Ordway to cover up to the remaining 25% <br />money needed for the projects, and short-term construction loans until <br />reimbursed by the CWCB loan money_ <br />2. Copy of letter from Michael J_ Miller, P.E., with URS, in regard to the Toe Drain <br />at the West Embankment. <br />3. West Embankment Toe Drain estimated construction cost. <br />4. Copy of the toe drains construction drawings_ <br />5_ 1999,2000, and 2001 year-to-clate Revenue Summaries <br />6_ Financial report for 1999 (you have year 2000). <br />7. Articles of Incorporation <br />8. By-laws <br />9. Copy of email from Michael L Graber, P.E., State Dam Safety, in regard to the <br />spillway _ <br /> <br />To get to the requested $653,000, I used $313,000 for spillway construction, $47,000 <br />for construction engineering, $47,000 for a spillway hydrologic study, and $3,000 for <br />land acquisition, which should total $410,000 for the spillway project. I added $32,000 <br />for construction engineering costs to the $211,000 construction cost to get a total of <br />$243,000 for the toe drain project. <br /> <br />Let me know what else you need. <br /> <br />Sincerely, <br /> <br />Qf.{,," ,J KL,\iLo <br />Allen L Ringle <br />Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.