My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00157
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00157
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:14 AM
Creation date
10/5/2006 11:41:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153702
Contractor Name
Silt, Town of
Contract Type
Loan
Water District
39
County
Garfield
Bill Number
HB 95-1155
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />10. Pursuant to House Bill 95-1155 (1995 Sessionl, the Colorado General Assembly authorized CWCB to loan <br />to the BORROWER an amount not to exceed Four Hundred Thousand Dollars ($400,000) for a term of thirty (30) years <br />for the construction of the PROJECT; and <br /> <br />11. Pursuant to ~31-15-302 et seq., CRS, the BORROWER has authority to contract to borrow money and to levy <br />assessments to assure repayment according to the terms of the contract, provided that an ordinance has been duly <br />adopted by the TOWN'S Board of Trustees; and <br /> <br />12. The STATE now desires, by this contract, to loan money to the BORROWER for this PROJECT upon mutually <br />agreeable terms and conditions, subject to the availability of funding for that purpose. <br /> <br />NOW THEREFORE, in consideration of the mutual and dependent covenants contained, it is agreed by the <br />parties as follows: <br /> <br />A. The BORROWER agrees as follows: <br /> <br />1. Construction Fund Program procedures. The following items are procedures the BORROWER will follow during <br />the construction phase of the PROJECT. <br /> <br />a. Preparation of plans and specifications. The BORROWER shall employ an engineering firm, hereinafter <br />referred to as the CONSULTANT, registered in the State of Colorado, to prepare PROJECT plans and <br />specifications. The CONSULTANT, the BORROWER/CONSULTANT agreement, and the PROJECT plans and <br />specifications must be approved in writing by the STATE. <br /> <br />b. Bidding. CWCB staff must approve bidding for the PROJECT. BORROWER may prepare the notice of award <br />and the notice to proceed with construction; however, both notices must be approved by the CWCB staff <br />before they are issued. The BORROWER shall conduct a pre-construction conference and the CWCB staff <br />will have the opportunity to review and approve the construction schedule. <br /> <br />c. Performance of work. The BORROWER shall contract for the construction of the work with responsible <br />and capable firms (hereinafter referred to as CONSTRUCTION FIRMS), which CONSTRUCTION FIRMS shall be <br />selected by the BORROWER and found acceptable by the STATE before work under this contract begins, or <br />BORROWER shall perform the work under the direct supervision of a registered professional engineer. <br /> <br />d. As-built drawings. Upon completion of the PROJECT, the BORROWER will provide as-built drawings of to <br />the CWCB staff for approval and filing. <br /> <br />2. Time for PROJECT completion. The BORROWER shall commence with the construction of the PROJECT as soon <br />as practicable after meeting necessary preconstruction requirements of this contract to effect completion within two <br />(2) years of the date of this contract. The PROJECT shall be constructed in accordance with the PROJECT plans and <br />specifications and any modification(s) thereof approved by the STATE. This time for completion may be extended <br />subject to the mutual agreement of the STATE and the BORROWER. The BORROWER must provide a written request of <br />extension sixty (60) days prior to the end of the two (2) year period for completion. The BORROWER further recognizes <br />that time is of the essence in the performance of its obligations under this contract. <br /> <br />3. Indemnification of the STATE. The BORROWER shall require all CONSTRUCTION FIRMS and their subcontractors to <br />indemnify the STATE and the BORROWER against all liability and loss, and against all claims and actions based upon or <br />arising out of damage or injury, including death, to persons or property, caused by any acts or omissions of those <br />parties or sustained in connection with the performance of any contract related to the PROJECT or by conditions created <br />thereby, or based upon an violation of any statute, ordinance, or regulation, and the defense of any such claims or <br />actions. <br /> <br />4. Liability insurance during construction. The BORROWER shall require the CONSTRUCTION FIRM and its <br />subcontractors to maintain during the term of their contracts for construction of the PROJECT the following insurance <br />with a company that is satisfactory to the STATE: <br /> <br />TOWN OF SILT <br /> <br />Page 2 of 9 <br /> <br />LOAN CONTRACT <br />
The URL can be used to link to this page
Your browser does not support the video tag.