My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00156
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:52 AM
Creation date
10/5/2006 11:40:59 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153721
Contractor Name
Lyons, Town of
Contract Type
Loan
Water District
5
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />7 presents details of the water utility's fmancial structure, Chapter 8 combines the fmdings of the <br />evaluations and presents alternatives and recommendations for the entire water system. <br /> <br />2.2 Population Served and Population Projection <br /> <br />The Town utility systems currently serve an estimated population of 1450, Growth by annexation <br />is limited on the north, west, and south through land use policies instituted by Boulder County, <br />These lands are either designated as open space or owned by mineral extraction interests, Land <br />acquisition to the east and infill of land already annexed remain viable possibilities for increases <br />in water demand, Potential for growth is primarily in: <br /> <br />Russell Subdivision <br />Lyons Valley Park Subdivision <br />Eagle Canyon Subdivision <br />Stone Canyon Subdivision <br /> <br />The Town Utility Department estimates the potential total population in the expanded service area <br />to be 3000 at build-out. Assessments and recommendations in this report will be based upon <br />service requirements of 3000 build-out/1450 existing, or 207 percent of current water demand, <br />and allow for the geographic distribution of the demand consistent with the above-mentioned <br />subdivisions, For the purposes of timing of some of the water system improvements, a population <br />projection is often helpful. Population data is developed in detail in Wastewater Treatment <br />System 201 Facilities Plan Update of January, 1996, In summary, the Town has adopted the <br />population projection of the Denver Regional Council of Goverrunents (DRCOG, 1994) as <br />follows: <br /> <br />Year 1990 <br /> <br />2005 <br />1858 <br /> <br />2010 <br />2134 <br /> <br />2015 <br />2450 <br /> <br />1995 <br />1409 <br /> <br />2000 <br />1618 <br /> <br />Population 1227 <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.