My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00156
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:52 AM
Creation date
10/5/2006 11:40:59 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153721
Contractor Name
Lyons, Town of
Contract Type
Loan
Water District
5
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 6. Performance Limiting Factors <br /> <br />Type Effects Limiting Factor <br /> Rating <br />Design A Clarifier function and performance, including rapid mix <br /> process, flocculation process, and sedimentation. <br />Design B Improvements to chemical addition systems and dry chemical <br /> handling and storage. <br />Design A Clearwell detention time with associated changes in chemical <br /> feed systems and high service pumps. <br />Design A Standby power system to maintain the WTP on-line in an <br /> emergency. <br />Maintenance B Lack of spare parts inventory for vital pieces of equipment. <br />Maintenance B Repair of backwash flow meter and influent flow meter. <br />Maintenance C Repair of distribution flow meter in meter vault. <br />Maintenance B Repair of storage tank level sensor and readout. <br />Operations A Filter influent and effluent monitoring points, and filter <br /> operation; filter-to-waste requirements. <br />Operations B Accuracy check of pump running time meters, flow meters, <br /> chemical feed rates. <br />Operations C Sludge handling and reclamation of backwash water (need for <br /> future improvement to meet future standards). <br />Administration A Manpower requirement with the objective of hiring additional <br /> staff. <br />Administration B Preventive maintenance system. <br />Administration B Preventive maintenance training and water process training for <br /> operators. <br /> <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.