My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00156
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:52 AM
Creation date
10/5/2006 11:40:59 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153721
Contractor Name
Lyons, Town of
Contract Type
Loan
Water District
5
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />24 hours (or 2,0 cfs for 12 hours), This volume converts to 1.983 acre-feet (at) for the same 24- <br />hour period, The water commissioner's data sheets are in Appendix A, <br /> <br />The Water Commissioner's data are used to estimate the Town's water rights over the water years <br />1991, 1992, 1993 and 1994, A water year (WY) is the 12-month period from the previous <br />November 1st to the current October 30th, <br /> <br />To obtain a rough estimate of the average annual yield of the Town's water supply, several <br />assumptions are made as follows, For the direct diversion right, the Town appears to have been <br />in priority for 194, 149, and 157 days, or an average of 167 days/year for the four years in Table <br />1. Yield would be: 1.0 cfs x 1.983 af/cfsd x 167 days/yr equals about 331 af/yr. as a rough <br />average, The average yield of 523 C-BT shares at 0,67 af/share is about 350 af/year, for a <br />combined total of 681 af of available yield in an average year. As shown in Table 2, current <br />usage is about 333 af/yr, about one-half of the average year yield available, Thus, the Town <br />currently has a (681/333 = 2,0) supply ratio for "average" year supply and demand conditions, <br /> <br />The adequacy of the current water supply essentially rests on two factors: optimum management <br />of the assets described above and the probability of annual yield, Determination of probable <br />annual yield is not within the scope of this report; it is dependent upon several random,= <br />operational and legal variables, To optimize management, however, the Town should carefully <br />review its exchange operations and its use of storage space in Button Rock Reservoir. Optimal <br />use of storage space in Button Rock Reservoir may increase the reliability of the water supply, <br /> <br /><j <br /> <br />< < The Town of Lyon has retained Jack Ross to work with RBD, INC. In this matter of <br />defining and optimizing Lyons' water resources. A summary of the report from the water <br />rights attorney goes here in the second draft. The report will be bound as an Appendix to <br />this report for reference. Some amendment or elaboration of the preceding text may be <br />required. A detailed listing of the Town's water rights, here or in the Appendix, is <br />appropriate. Several actions are being considered by the Town, including an exchange <br />agreement with the City of Longmont. The water commissioner, Bill Gambrell, is very <br />familiar with the disposition of water rights for Lyons and says he supports an exchange <br />arrangement, as has been practiced by Lyons for many years. > > > <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.