My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150082 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150082 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2011 1:24:06 PM
Creation date
10/5/2006 11:40:54 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150082
Contractor Name
Consolidated Home Supply Ditch and Reservoir Company, The
Contract Type
Loan
Water District
3
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed, IIu: <br /> <br />Comp''"}', the Company" engineer and the State Darn Safety F.ngineer have identified an <br /> <br />emergenC'y re~flrtlin~ the d9tns of the 119m for M9ri9nn {RoedeC'ker) Reservoir The w~der <br /> <br /> <br />level of the reservoir h9S heen lowered so th9t the cl9rn is not in jeop9rdy Tn order to rep9ir <br /> <br /> <br />the rlefe"t in the d9m struC'hlre prior to season g) finin~ for the resfl:rvnir (Novemhp.rr '2001\ <br /> <br /> <br />the rep9ir god rehahilihdinn work mnst he desig-nerl god {'ondru('terl immecli9tely The <br /> <br />repAir seoping: h9S not heen l"ompletecl gDd is in pro{'pss hy the Comp9ny's eng:jneer gnd the <br />Colorado Darn Safety F.ngineer'. om"e ~Jim DlIhler) The rehahilitlttion of the darn <br />ne"e..at:}' to remed}' the identified prohlem ha. not heen "ompleted at thi. time. The water of <br /> <br />the (;omp911Y'!iI. ~dem is. n~u~rI prim9rily for 9e;ri{,1IIhlr91 irrig9tion god 9!ii1. g sonrC'p. of r9W <br /> <br />w~tter for tre~1tment for clomes"" lIse with some irri~9tion for opp:n Sp9{,P 9rp9!ii1. The finin~ <br /> <br />priority of thi. re.ervoir i. Fird Priority datil1g from Fehn."t:)' 1, 111111, and i. a "ritieal part <br />or the irri~~tion ~y~tp.m for the Comp9ny <br /> <br />Water Right: <br /> <br />CFS, <br /> <br />A Y<Ol"!;" l"'" 2001 diverted per year: 2~,6~1 acre-feet, <br /> <br />6, Will the acquisition of additional water rights be necessary? YES _ NO X <br /> <br />If YES, please explain, <br />7, Please list the names and addresses ofthe Applicants' engineer( s) and attomey( s), <br />NAMF ADDRFSS .."<1 PHONF <br /> <br />Randolph W Starr <br /> <br />1 <;0 F,,,d 29th Street, Suite 211<;, P 0 Rox 642, T ,oveland, CO <br /> <br />1I0<;~9-0642, Attorn~}' At L"w, Voi"e 970-667-1029, F"x 970-669-~1I41, F.mail: <br />RST A RRII<;<;~@"ol."om <br /> <br />Coil'}' Hayden <br /> <br />RoC'1qr Monntgi" Cons:nlt9nts.r Tn~ t R2~ ne19w9rp. Avennpr <br /> <br />LOl1gJllont, CO 110<;01, Voi"e ~m-772-<;2112, Fax ~O~- {,{,S _''''5'9, F.mail" <br /> <br />~h9y,.len@lon1? rmC'('fl {'om <br /> <br />8, List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application, No fea.ihility .tudie. are ne"e.."t:}' .in"e thi. i. " d"m rehahilitation prl1ieet. <br />An ~us.es:s.mp.nt of the s'f'ope god {'ost of work is. in prol"Ps's. hy the Cnmp9ny's. en~np.p.r <br />(a hove) <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.