My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00150
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2011 3:14:55 PM
Creation date
10/5/2006 11:39:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150116
Contractor Name
B.F. & M.E. Porter, LLLP
Contract Type
Loan
Water District
45
County
Garfield
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />Permitting: <br /> <br />All easements and rights~of-\Vay have been arranged. The Bureau of Land lvlanagement (BLM) <br />has also approved the project as a small ponion of the east dam and the reservoir is on BL\l <br />propert:", The Barton Porter Reseryoir Expansion is exempt from 404 permitting. which has <br />been confirmed with the Army Corps of Engineers. <br /> <br />Institutional Considerations <br /> <br />Entities that are. or may be, involved in the design. construction. and financing oflhe project <br />include; <br /> <br />. Bill and Barton Porter; financing. construction. and project management <br />. Porter Seed and Cattle Inc.; construction <br />. Golder Associates Inc.; design and construction. and <br />. Colorado Water Conservation Board (eWeR); financing. <br /> <br />Bill and Barton Porter will be the lead for the financing, design. and construction of the project <br />and will be the entity entering into contracts and agreements with the various other entities for <br />services provided by each. <br /> <br />Financial Analysis <br /> <br />Two entities will be involved in financing the estimated total project cost of$2 million. Bill and <br />Banon Porter are jointly applying for a loan from the eWCB in the amount of S I million. The <br />actual or estimated amounts by enrity are given in Table 4. <br /> <br />T:lblc.t. Sources of Funding <br /> <br />Eutit)" Private Loan Percent <br />Participation <br />CWCB $0 S I ,000,000 50% <br />Bill and Barton SI.OOO.OOO SO 50% <br />Porter <br />Totals SI,OOO,OOO SI,OOO,OOO 100% - $2,000.000 <br /> <br />Bill and Barton Porter will cover any costs that exceed the esrimared project cost. They are <br />requesting a 20-year loan from the CWCB. The standard agricuhurallending rate included in the <br />CWCB loan application would be 2.5%. resulting in annual payments of approximately 564.000. <br /> <br />Table 5 summarizes the financial aspects of the project. <br /> <br />Bill andB3non POl'k'f <br />ResCO'oirhpansionFeasitlilil]oSlud) <br />AugllSI200~ <br />l'IJ:r..:-"S'OJeqIJ]Olo(l:12)~8 0101 ~ DOC <br /> <br />PagclOofl3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.