Laserfiche WebLink
<br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />SUl,llMRY SHEETS (Continued) <br /> <br />PROJECT FEATURES (Continued) <br /> <br />Diversion Dams <br /> <br />OverfloH crest lenGth (ft.) <br />Diversion capacity (sec.~ft.) <br /> <br />Distribution Systems <br /> <br />Black Mesa Conduit <br />Fruitland Canal <br />Gould Canal structure improvements <br />Laterals <br />Crystal Creek channel protection <br /> <br />HYDROLCGY <br /> <br />Crystal <br />Creek <br />60 <br />600 <br /> <br />Length <br />(miles ) <br />10.t! <br />22.0 <br />1.8 <br />22.0 <br />2.7 ' <br /> <br />Soap Creek at Soap Parle Dam site <br />Drainage area (sq. mi.) <br />Av~rage romual runoff 1932-57 (ae. -ft.) <br />!1aximUlU annual runoff 1957 (ac. -ft.) <br />Minimwn annual runoff 1934 (ae. -ft.) <br />Inf10v design floOd, volume 15 da.ys (a.e.-ft.) <br />InflO1T design flOOd, peak discharge (sec. -ft.) <br /> <br />Curecanti Creek at diversion dam site <br />Drainage area (sq. mi.) <br />Average annual runoff 1932-57 (ac.-ft.) <br />Jilaximwn annual runoff 1957 (ac. -ft.) <br />Minimum annual runoff 1934(ac.-ft.) <br /> <br />Crystal Creek at diversion dam site <br />Drainage area (sq. -mi.) <br />Average a.nnual runoff 1932-57 (ac. -ft. ) <br />Maximum annual runoff 1957 (ac.-ft.) <br />!-linimwn annual runoff 1954 (ac. -ft.) <br /> <br />REMARKS <br /> <br />Curecanti <br />Creel, <br />50- <br />250 <br /> <br />Initial <br />capacity <br />(sec.-ft.) <br />275 <br />600 <br />120 <br />5 to 20 <br /> <br />If8.6 <br />40,600 <br />76,900 <br />14,500 <br />29,000 <br />7,330 <br /> <br />17.2 <br />18,900 <br />34,300 <br />7,000 <br /> <br />41.9 <br />25,100 <br />56,400 <br />8,200 <br /> <br />The Fruitland Nesa vlater Conservancy District is presently being formed <br />a.s the contracting organization for the Fruitland Mesa project. <br /> <br />6 <br />