Laserfiche WebLink
<br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />CHAPTER III <br /> <br />DESIGNS AND ESTIMATES <br /> <br />JIighllay 92, the canal construction 1Tould be entirely nell. The canal <br />llould. then follo\r the route of the existinc ditch for 1.8 miles but <br />1Tould be constructed on nell aliglllllent over the remainder of its <br />length. Data on capacities and lenGths of the various reaches of the <br />canal are sh01m belO1", <br /> <br />Canal capacity <br />(second-feet) <br />600 <br />550 <br />300 <br />150 <br />100 <br />75 <br />50 <br />30 <br /> <br />Length of ca.nal <br />reach (miles) <br />0.:; <br />2.0 <br />5.2 <br />2.2 <br />3.6 <br />3.0 <br />1.8 <br />3.7 <br /> <br />Except for four siphons and two inclined pipe drop structures <br />with a combined length of 7,000 feet, the entire canal would be of earth <br />construction. Earth lining has been included in the cost estimate for <br />about a third of the canal length. All of the siphons and drop struc- <br />tures would. be of precast concrete pipe. Data on the structures are <br />shown below. <br /> <br />Type of Length Diameter Capacity <br />structure ( feet) ( inches) (second-feet ) <br />Siphon 530 72 300 <br />Siphon 820 72 300 <br />Siphon 3,600 48 100 <br />Siphon 500 42 75 <br />Drop 1,450 24 30 <br />Drop 100 24 30 <br /> <br />The first 0.7 mile of the canal would be constructed in soils <br />derived from Mancos shale and the remainder would be in Dakota sandstone <br />and overlying so Hs. Suitable earth-lining materials are available <br />along the canal route. Nearly all of the route would be across open ter- <br />rain with gentle cross slope and light covering of brush and scattered <br />juniper trees. <br /> <br />Major turnouts would be constructed to Cattlemens ditch, to a <br />draw leading to Gould ReserVOir, and to Castle Canyon. Numerous addi- <br />tional turnouts would be provided to release water for distribution to <br />Upper Iron Creek and Upper Fruitland Mesa lands. A new bridge 'Would be <br />required at the Colorado State Highway 92 crossing. Other minor struc- <br />tures would be provided at drainage crossings. <br /> <br />22 <br />