My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00147
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2010 3:06:24 PM
Creation date
10/5/2006 11:39:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153637
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 92-87
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />would be expected to be similar to thoge at No.5. There Is no visible Indication <br />of any stab!llty problems with No. 5 alnce It was rehabilitated In 1980 other <br />than at the toe near the outlet as described above. <br /> <br />No property surveys were conducted and no problems are anticipated with the <br />reservoir boundaries due to the limited area that requires construction. <br /> <br />A visible Inspection of the site did not reveal any special drainage problems <br />such as those noted for No.6. <br /> <br />The potential for siltation of the batlln above Reservoir No. II Is outlined In <br />Section A.9. above. Reservoir NO.6 would not expected to pick up more than 76 <br />to 100 acre-feet of slit over a 100 year period. This amount Is Insignificant <br />compared to the reservoir capacity. <br /> <br />C. MISCELLANEOUS ALTERNATIVES <br /> <br />I. Inlet Ditch Control Structure. 'fhe Inlet ditch to fill Reservoir No. 5 and <br />No. 6 Is controlled by a gated concrete structure that Is In need of repair. The <br />gate sill Is eroded and needs to be removed and replaced. A portion of the <br />structure floor slab Is eroded and spaJJlng and needs to be chipped out to sound <br />concrete and repaired. The structure apparently has no upstream cutoff and <br />water runs under the structure. A cutoff needs to be Installed and the void <br />under the slab grouted. The structure also needs an energy dissipation device to <br />Inhibit the downstream erosion. <br /> <br />2. Measuring Flume. A measuring flume should be Installed below the Inlet <br />ditch control structure to measure the volume of water diverted out of the <br />Poudre Valley canal Into the two reservoirs. This Is required to determine the <br />payment to the Poudre Valley Reservoir Company from North poudre for water <br />that runs through their ditch. The flume will also help the North Poudre ditch <br />rider set the gates at the control structure and control the quantity of water <br />being diverted. <br /> <br />PAGS Ii <br />Cblpler V - No. 6 Peuiblllty <br />
The URL can be used to link to this page
Your browser does not support the video tag.