<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />A.6. GEOTECHNICAL EVALUATION <br /> <br />I. Stability. The dam stabilIty was not numerIcally analyzed at this time <br />due to the use of exIsting geotechnical data that will have to be checked at a <br />later date. Based on past analyses and design of dams using similar soils, we <br />are confident no stability problems would be expected with 3H to I V slopes. The <br />existing geotechnical Investigation does not Indicate any foundation or embank- <br />ment deficiencies or problems that would be expected to create stability problems. <br />The stability of the dam and foundation will be rigorously analyzed after a new <br />geotechnical investigation is conducted and strength tests conducted on the <br />expected fill materials. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2. Seepage. A rigorous seepage analysis was not conducted on the dam at <br />this time. The seepage was roughly estimated for the quantity of flow expected <br />through the sand layer found In the central portion of the dam. The seepage <br />through the dam fIlI and clay foundation are expected to be low as the clays in <br />both are expected to have permeabllltles in the range of 10-6 to 10-6 ce~tImeter_~ <br />per second. The sand layer was estimated to have a permeability of 10 to 10 <br />centimeters per second. The seepage due to the sand layer was estimated to be <br />1.0 cubic feet per second or 2 acre-foot per day for the 1200 foot of estimated <br />lateral width. This Is expected to be greater than will be experienced and will <br />be analyzed more rigorously prIor to the final design. <br /> <br />A.7. HYDROLOGIC AND HYDRAULIC EVALUATION <br /> <br />The hydraulic and hydrologic design references and hydrologic report are included <br />In Appendix C. This Includes the Inflow and outflow hydrographs for a 75% and <br />a 100% PMP flood and the stage-discharge curves for a 300 foot and 350 foot <br />spillway. The capacity charts for the various sizes of outlet conduits considered <br />are also Included In Appendix C of this report and are discussed in the next <br />section. <br /> <br />A.B. STRUCTURE PLANS <br /> <br />I. Embankment. The existing main dam and saddle dam embankments require <br />regrading and additional fill to bring them to proper freeboard height and to a <br />consistent slope. The main dam and saddle dam crests will be raised approx- <br />Imately 3 to 5 feet In elevation. The main dam will require fill on the upstream <br />slope to provide for the additional crest height. The upstream fill will be sandy <br />clay materials and will also provide some protection against seepage trough the <br />dam embankment. Adequate sandy ciay borrow exists on the site In the reservoir <br />bottom to provide for all the fills required. The potential borrow sources contain <br />several times the quantity of material required for the project. <br /> <br />The embankment sections considered are at slopes of 3 horizontal to I vertical. <br />These slopes are considered to be the minimum face slopes recommended from the <br />practical considerations for placement of rlprap and bedding and for seeding the <br />downstream section. Steeper slopes could be permitted based on the structural <br />stability but would result In thicker rlprap sections, problems with the down- <br />stream slope erosion control, and Increased unit cost for application of the <br />erosion protection. Flatter slopes are not deemed necessary from either <br /> <br />PAG! I <br />Cbapter V - No. 6 Felliblllty <br />