My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00147
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2010 3:06:24 PM
Creation date
10/5/2006 11:39:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153637
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 92-87
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The North Poudre Irrigation Company <br /> <br />P. o. Box 100 Phone 568-3612 and 568.3966 <br />Wellington, C~lorado 80549 <br /> <br />September 25, 1992 <br /> <br />Mr. Keith Eberhardt, P.E. <br />Coiorado Water Conservation Board <br />i313 Shennan Street <br />Denver, Co 80203 <br /> <br />RE: North poudre Reservoir No.5 and No.6 feasiblllty study. <br /> <br />Dear Mr. Eberhardt: <br /> <br />The North Poudre Irrigation Company is herewith transmitting the feasibil- <br />ity study for the rehabllitation of North poudre Reservoirs No. 5 and No.6. <br />The feasiblllty study was conducted as l>art of North poudre's application to the <br />Coiorado Water Conservation Board to obtain financing for 100 percent of the <br />project cost for the rehabllltation of Reflervoirs No. 5 and No.6. <br /> <br />The attached report has been prel>ared in accordance with the Colorado <br />Water Conservation Board Guidelines and. as modified by CWCB personnel. All <br />required documents are included in the report which consists of six (6) chapters <br />and Appendices A through D. <br /> <br />With the submittal of this report, The North poudre Irrigation Company <br />formally requests funding for the project from the Colorado Water Conservation <br />Board Construction Fund to finance 100 percent of the project cost for the <br />rehabllltation of Reservoir No. 5 and NO.6. The total project cost for the <br />alternative chosen by The North Poudre Board of Directors is approximately <br />$1,800,000.00. Your consideration and approval of this funding wlll be greatly <br />appreciated. <br /> <br />ron?:/ ~ <br /> <br />~l Pineda, President <br />The North Poudre Irrigation Company <br /> <br />MP/dhs <br />
The URL can be used to link to this page
Your browser does not support the video tag.