My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150004 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150004 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2010 3:43:19 PM
Creation date
10/5/2006 11:39:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150004
Contractor Name
Fort Morgan, City of & Fort Morgan Water Works and Distribution Enterprise
Contract Type
Loan
Water District
1
County
Morgan
Bill Number
HB98-1189
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />, <br />( <br />J <br />t <br />, <br /> <br />On June 17 of this year, the City held an election on the completion of the project. As <br />reported to us by the City Staff, the vote was 69 percent in favor of the project with a <br />voter response of about 60 percent. <br /> <br />e <br /> <br />Discussion <br />The City is pursuing both short-term and long-term financing for the project at the present <br />time. Table 2 is a summary ofthe City's long-term financial plan which would include <br />borrowing from the CWCB and the Water & Power Authority as well as a loan and grant <br />from Rural Development. The City would like to pursue $4.0 million in funding from the <br />Board in 1998 and in 1999 for a total of$8.0 million. <br /> <br />Table 2. Proposed Long-Term Funding Scenario <br /> <br />Year <br /> <br />Source and Type <br /> <br /> <br />e <br /> <br />1997 <br />1997 <br />1997 <br />1998 <br />1999 <br /> <br />Rural Development - Grant <br />Rural Development -Loan <br />CWRPDA - Loan <br />CWCB -Loan <br />CWCB -Loan <br /> <br />The proposed funding from the CWCB would be used for the construction of the raw <br />water pipeline and the raw water reservoir. The total cost of raw water facilities for the <br />entire project is estimated at $23 million. With the $5.5 million existing loan and a <br />potential $8.0 million in new financing from the CWCB, the Board's investment in the <br />project would amount to $13.5 million or approximately 58 percent ofthe cost ofthe raw <br />water facilities. <br /> <br />Short-term financing is being pursued by the City in conjunction with George K. Baum & <br />Company of Denver. The plan involves interim financing using variable rate revenue <br />bonds which are intended to be retired eventually by the long-term sources suggested in <br />Table 2. The variable rate revenue bonds would have a weekly floating interest rate and <br />can be repaid at any time, in part or in full, without penalty. The bonds would be secured <br />by water system revenues and backed by a letter of credit from a commercial bank. <br /> <br />In June of this year, the City staff submitted to us a revised 40-year projection of <br />expenditures and revenue requirements for implementation of the financial plan outlined in <br />Table 2. That projection indicates that the average monthly water bill may increase to <br />about $53 per month over the next several years (from the current level of about $22 per <br />month). <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.