My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00137
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:09 AM
Creation date
10/5/2006 11:38:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153467
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
0
County
Weld
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br /> <br />=============================================================================== <br /> <br />Table V;3; Twin Lakes Dam <br />Rehabilitation Alternative No.3 <br /> <br />o Replace outlet works by pipe jacking new conduit through embankment <br />and plugging existing conduit. Construct new inlet and outlet <br />structures. <br /> <br />o Raise dam crest from elevation 9300 to 9308 to provide storage <br />capacity of approximately 460 acre-feet and freeboard during <br />fl oodi ng. <br /> <br />o Construct RCC overflow di ke spi 11 way across exi sti ng spi 11 way channel <br />with a crest elevation of 9303. <br /> <br />o Pl ace fi lter bl anket on downstream face and foundati on surface to <br />control and collect seepage. <br /> <br />o Install toe drain system to collect and discharge seepage. <br /> <br />o Flatten downstream slope to 2.5:1 with sand and gravel pit run <br />material. <br /> <br />o Remove existing riprap to raise dam. <br />o Provide 3:1 upstream slope using sand and gravel pit run material: <br /> <br />o Place bedding layer and riprap on upstream slope. <br /> <br />Outlet Works Option <br /> <br />Plug existing conduit and construct siphon over crest of dam. <br /> <br />Spi 11 way Opti on <br /> <br />Construct earth dike across existing spillway channel and provide a <br />rock cut spillway on the right abutment of the dam. <br /> <br />=============================================================================== <br /> <br />The degree of techni cal confi dence wi th regard to embankment stabil i ty for <br />this alternative is moderate. Collecting and controlling the seepage passing <br />through the dam would help to control the phreatic surface and enhance <br />embankment stabi 1 i ty. However, the pervi ous nature of the embankment <br />materi al s reveal ed duri ng drill i ng i ndi cates that pi ezometri c 1 evel sin the <br />dam will remain relatively high if seepage reduction measures are not employed. <br /> <br />The technical confidence <br />existing embankment is low. <br /> <br />associated with <br />The behavi or of <br /> <br />jacking a conduit through the <br />materials surrounding the pipe as <br /> <br />-67- <br />
The URL can be used to link to this page
Your browser does not support the video tag.