My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00137
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:09 AM
Creation date
10/5/2006 11:38:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153467
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
0
County
Weld
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />. <br />. <br />. <br />. <br />. <br />.. <br />I <br />I <br /> <br />========================================================================================= <br /> <br />ALTERNATIVE <br /> <br />1 <br /> <br />========================================================================================= <br /> <br />DESCRIPTION <br /> <br />ESTIMATED COST <br />INCLUDING 25% CONTINGENCY <br /> <br />Replace dam and outlet works with RCC dam at <br />elevation 9305. Grout dam foundation. Con- <br />struct earth dike in existing spillway site to <br />elevation 9308. Increase normal reservoir pool <br />from elevation 9295 to 9303 in order to increase <br />storage capacity to 460 acre-feet. <br /> <br />$ 450,000 <br /> <br />2 <br /> <br />- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> <br />Excavate portion of dam and replace outlet works. <br />Raise dam crest eight feet to increase storage <br />capacity to 460 acre-feet. Construct RCC overflow <br />dike spillway across existing spillway channel, <br />with a crest elevation of 9303. Place filter <br />blanket and toe drain on downstream slope. Grout <br />dam foundation, remove riprap from upstream face <br />and replace with soil cement. <br /> <br />$ 394,000 <br /> <br />3 <br /> <br />- - - - - - - - - - - - - - - - - - - - <br /> <br />- - - - - - - - - - - <br /> <br />Replace outlet works by pipe jacking new conduit <br />through embankment and plugging existing conduit. <br />Construct new inlet and outlet structures. Raise <br />dam crest eight feet to 9308, to increase storage <br />capacity to 460 acre-feet. Construct RCC overflow <br />dike spillway across existing spillway channel, <br />with a crest elevation of 9303. Place filter <br />blanket and toe drain and flatten downstream slope. <br />Remove riprap from upstream face, flatten upstream <br />slope with impervious material, bed, and replace <br />riprap. <br /> <br />$ 358,800 <br /> <br />========================================================================================= <br /> <br />vii <br />
The URL can be used to link to this page
Your browser does not support the video tag.