Laserfiche WebLink
5.0 IDENTIFICATION AND EVAIUATION OF PLAN COMPONENTS <br />5.1 INTRODUCTI�N <br />5.2 NON-STRUCTURAL COMPONENTS <br />5.2.1 Water Management and Conservation Measures <br />5.2.2 Recreation Components <br />5.3 STRUCTURAL COMPONENTS <br />6.0 IN-BASIN DEVELOPMENT PLAN FORMULATION AND EVALUATION <br />6.1 PLAN FORMULATION <br />6.2 PLAN EVALUATTON <br />6.3 SCREENING Of ALTERNATIVE PLANS <br />7.0 FINANCIAL ANALYSIS OF PREFERRED PLAN <br />7.1 INTRODUCTION <br />7.2 SOURCES OF FUNDING AND RESU�TING ANNUAL COSTS <br />7.3 SOURCES AND AMOUNT OF DIRECT PROJECT INCOME <br />7.4 OTHER PROJECT BENEFITS <br />7.4.1 Economic Impact of Increased Tourism <br />7.4.2 Environmental Indirect Benefits <br />7.4.3 Flood Protection Benefits <br />7.5 PQTENTIAL SOURCES OF SUPPLEMENTAL INCOME <br />8.0 POTENTIAL FINANCIAL ENHANCEMENT <br />8.1 INTRODUCTION <br />8.2 PUMPED STORAGE NYDROELECTRIC POWER 6ENERATION <br />8.3 OUT OF BASIN WATER SALES <br />8.3.1 Introduction <br />8.3.2 Methodology and Assumptions <br />8.3.3 Modified Central Colorado Project <br />8.3.4 Taylor Park Project <br />8.3.5 Collegiate Range Project <br />8.3.6 Union Park Project <br />8.3.7 Vatue of Water <br />8.3.8 Conclusion <br />�� <br />5-1 <br />5-1 <br />5-2 <br />5-2 <br />5-4 <br />5-4 <br />6-1 <br />6-i <br />6-1 <br />6-5 <br />7-1 <br />7-1 <br />7-1 <br />7-2 <br />7-3 <br />7-3 <br />7-3 <br />7-4 <br />7-4 <br />. <br />., <br />