Laserfiche WebLink
�l <br />C� <br />, <br />' <br />� <br />' <br />Mr. Uli Kappus, P.E. <br />Colorado Water Resources and <br />Power Development Authority <br />Page Three <br />up to 100,000 acre-feet of water annually. These export plans were <br />analyzed without drawing conclusions regarding the issue of the legal <br />availability of water. The estimated cost of implementing the <br />alternatives studied are within the range of water development costs <br />currently being experienced by municipal and industrial users along <br />the front range. <br />We wish to express our appreciation for fiaving had the opportunity to <br />' perform this study and also for the excellent support and guidance we <br />received from Mr. Blaine Dwyer, the Authority's Project Manager. We <br />also wish to acknowledge the valuable input and insights we received <br />, from the Technical Steering Committee and the Advisory Committee <br />throughout the course of the study. We look forward to future <br />opportunities ta be of service to the Authority. <br />' <br />, <br />, <br />' <br />' <br />1 <br />1 <br />1 <br />1 <br />I� <br />' <br />Very truly yours, <br />HDR ENGINEERING, INC. <br />C�'''2�� <br />Andrew Tczap, P.E. <br />Project Manager <br />AT:jb <br />Enclosure <br />