My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FS0025X Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
FS0025X Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2014 4:25:13 PM
Creation date
10/5/2006 11:37:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0025X
Contractor Name
Upper Gunnison Uncompahgre Basin CWRPDA 1989
Contract Type
Loan
Water District
0
County
Archuleta
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
803
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5.2.2 Recreation Components <br />A large number of potential recreation improvement opportunities were <br />identified in the study area. While all of these would result in improved. <br />recreational opportunities, not all of them would result in "... increased <br />tourism and related economic benefits..." as required by Target Objective 2. <br />The preliminary list was reviewed to identify the components that would meet <br />the study target objectives. The resulting list of components was then <br />screened on the basis of technical, environmental, economic and institutional <br />factars to arrive at a list of recreation camponents recomsstended for inclusion <br />in alternative plans. That list is presented in Table 5.2. <br />5.3 STRUCTURAL COMPONENTS <br />Since no M&I shortages were identified in the study area, no components <br />were considered for the sole purpose of ineeting future M&I needs. It was <br />recognized, however, that it may become desirable for the City of Gunnison to <br />convert from its present 9roundwater system to a surface water system with <br />storage in the future as discussed in the report, Water Suoolv Svstem <br />Evaluation and Im�lementation Plan, prepared by WRC Engineering, Inc., in <br />1981. Although the City has contracted to purchase water and storage space <br />from the proposed Union Park Reservoir, the possi6ility of servi�g the City's <br />potential storage needs was taken into consideration when identifying storage <br />reservoirs to meet other in-basin purposes. This was achieved by locating <br />potential reservoirs to be able to serve that purpose from a pBysicaT and <br />hydrologic standpoint. <br />5-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.