My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FS0025X Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
FS0025X Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2014 4:25:13 PM
Creation date
10/5/2006 11:37:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0025X
Contractor Name
Upper Gunnison Uncompahgre Basin CWRPDA 1989
Contract Type
Loan
Water District
0
County
Archuleta
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
803
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.8 MODEL CALIBRATION <br />i� <br />�1 <br />The model was calibrated agatnst historical data for the years 1979 <br />through 1983. Comparisons were made between historical streamflows and <br />reservoir contents and those predicted by the model. Model parameters <br />relating to simulation of operating procedures and to calculation of return <br />flows were adjusted as required to achieve closer agreement between modeled <br />and historical results. The final model calibration showed a good correlation <br />between historical and modeled results. <br />KD[� <br />
The URL can be used to link to this page
Your browser does not support the video tag.