My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FS0025X Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
FS0025X Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2014 4:25:13 PM
Creation date
10/5/2006 11:37:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0025X
Contractor Name
Upper Gunnison Uncompahgre Basin CWRPDA 1989
Contract Type
Loan
Water District
0
County
Archuleta
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
803
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
In addition, the Study has been performed with the aid of the U.S. Bureau <br />of Reclamation (USBR) through their Technical Assistance to States Program. <br />Their participation consisted of providing in-kind services and producing <br />certain Study products as an adjunct to the Study Team. The USBR's <br />participation included input to most of the study tasks, but concentrated on <br />the areas of: collection and analysis of hydrologic data; preparation of <br />agricultural water demand forecasts; identification and evaluation of <br />structural components; and preparing environmental evaluations of components <br />and plans. It has been the Authority's responsibility to promote coordination <br />between HDR and the USBR as well as to make final decisions regarding the <br />Study direction after considering input from Study sponsors, committees, and <br />the general public. <br />1.2 STUDY OBJECTIVE <br />The objective of this Study was to identify and evaluate water resource <br />management plans to enhance the water-based economy of the Study Area in an <br />environmentally sound manner, Both structural and non-structural components <br />have been examined. The purpose of the structural measures (such as dams, <br />pipelines, and tunnels) is to develop additional water supplies consistent <br />with the in-basin needs and the State's compact entitlements. The purpose of <br />non-structural measures (such as enhanced water management through water <br />exchange, reuse, and conservation) is to obtain greater enyironmental and <br />economic benefits from the existing resource base. <br />Given the apparent inability of recreational and agricultural water users <br />to pay for additional water development, other sources of revenue> including <br />hydropower generation and potential out-of-basin water sales, were evaluated. <br />This was done to identify very general options which, when combined with the <br />preferred in-basin development plan, would result in a more comprehensive <br />project with enhanced financial attractiveness. These options may require <br />participation from electrical power entities or east slope water suppliers. <br />This study has not speculated on the specific institutional relationships that <br />might be involved. If these entities pursue a cooperative approach to project <br />1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.