Laserfiche WebLink
' <br />J <br />, <br />, <br />' <br />fl <br />� <br />' <br />' <br />, <br />, <br />, <br />' <br />� <br />, <br />lJ <br />I I <br />, <br />' <br />, <br />Fi ure <br />1.1 <br />1.2 <br />5.1 <br />5.2 <br />5.3 <br />5.4 <br />5.5 <br />5.6 <br />6.1 <br />6.2 <br />6.3 <br />6.4 <br />8.1 <br />8.2 <br />8.3 <br />8.4 <br />9.1 <br />LIST OF FIGURES <br />Basin Map <br />Time Required to Implement a Water Development Project <br />Storage Sites Retained for Further Study <br />Los Pinos Project Layout <br />Pauline Project Layout <br />Castleton Project Layout <br />Elko Project Layout <br />Sargents No. 3 Project Layout <br />Castleton Reservoir, Scenario 26 Reservoir Levels <br />Sargents Reservoir No. 3, Scenario 26 Reservoir Levels <br />Pauline Reservoir, Scenario 2B Reservoir Levels <br />Blue Mesa Reservoir No-Action versus Scenario 2B <br />Needle Point No. 3 Pumped-Storage Project <br />Rocky Point Pumped-Storage Project <br />Alternative Transbasin Export Projects <br />Export Yield versus Instream Flow <br />Blue Mesa Reservoir Level, No-Action versus Scenario 8 <br />-5- <br />Paae <br />