Laserfiche WebLink
<br />retention of these rights. The State Engineer'li Office suggested <br />installing measuring devices on this proposed system to help prove <br />up on the conditional. claim. The project ~lill include meters at the <br />intake site whiCh \o1ill measure all water in the tVlO 6" lines that come <br />from the intake. <br />The town of Fico cannot use all this water at the present, but <br />if the growth pattern progresses as similar mountain towns such as <br />Telluride and Silverton, the 3.0 c.f.s. use figure is realistic. In <br />fact, I feel that the 3.0 c.f.s. figure is realistic as a potential <br />use figure for the foreseeable future for Rico and that the 2.72 c.f.s. <br />conditional decree should be made an absolute decree as soon as possible. <br />The d~cree discussed above is attached to this report in <br />Appendix F. <br />The breakdown on proposed water use on the c.O c.f.s. figure is <br />1.2 c.f.s. ultimate demand for residential and commercial and 1.8 c.f ,s. <br />ultimate demand for industrial water. <br />