My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153166 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153166 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:08 AM
Creation date
10/5/2006 11:37:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153166
Contractor Name
Rico, Town of
Contract Type
Loan
Water District
0
County
Dolores
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Monthly Stream Flo,r.; from Calibration of~)eir on <br /> Silver Creek to the Dolores River Gaging Station <br /> in acre-feet <br /> - <br />Year Oct. Nov. Dec. Jan. Feb. Hartl Apr. Ha.y June July Augo Sept. <br />1964-6S 127 98 88 93 81 90 839 2477 11094 2388 878 561 <br />1965-66 368 178 133 105 86 230 896 2738 1248 366 227 153 <br />1966-67 125 87 lJS 72 63 167 5]4 1633 1090 368 1;28 357 <br />1967-68 :iS5 88 'r8 76 74 131 305 1859 3670, 703 ,735 179 <br />1968 -69 125 90 67 63 57 72 846 3040 23L5 981 404 407 <br />1.969..:70 407 259 166 124 105 106 290 2911 1766 578 435 1002 <br />1970-71 330 212 178 ]48 139 269 854 1493 2715 573 284 193 <br />1971-72 189 149 114 103 96 357 768 :iS43 1285 243 153 184 <br />1972-73 656 276 166 136 110 150 351 3103 4887 1955 426 222 <br />1973-74 136 95 94 86 71 135 319 2237 942 3JS 186 104 <br />1974-75 III 100 76 70 56 77 205 1825 4824 2751 370 207 <br />Av. Month- <br />Jy Flow 248 148 116 98 85 162 562 2260 2624 1020 412 324 <br /> <br />Average annual yield of Silver creek Drainage:' 8,059 acre-feet <br /> <br />Average flow: 11.13 c.f.s. <br />* Maximum flow: 170.00 c.f.s. <br />Minimum flow: 0.563 c.f.s. <br /> <br />* Using standard record flood computations, we find that this figure <br />is somewhat low. Therefore, we will use the figures from standard <br />computations for a record flood. The flood studies conducted by <br />the state in connection with H.B. 1041 flood hazard studies shorr <br />the Do;J.ores River at 5,000 c.f .5. This would mean Silver Creek <br />would show 400 c.f.s. <br /> <br />?? <br />
The URL can be used to link to this page
Your browser does not support the video tag.