Laserfiche WebLink
<br />),) <br />(, <br /> <br />)''l <br />l ' <br /> <br />5. Chapter IV. Water <br /> <br />a.. .Wat:.e!:." Req'..liremencs a <br /> <br />(1) Development. of water requirement.s for municipal and indus- <br />t.rial '<later, including peak hourly, daily, weekly and m:mt..'11y <br />uses. <br />(2) Agricult.~ral water supplies are not involved. <br />(3) Water losses frOm point of diversion to point. of delivecy are <br />not considered relevant. <br />(4) Mont.!1ly Wat.er Diversion requirements are not considered rele- <br />vant. <br />(5) project.ed project requirements are not expec::ed to change <br />during payout period, since no reservoir expansion is <br />included . <br /> <br />b. Surface Water Supply. <br /> <br />(1) <br />(2) <br /> <br />Water releases from Hourglass Dam will be given for 10 <br />'consecut.ive years. <br />Neither recreational nor. fish and wildlife b~~efits are being <br />claimed for Hourglass Reservoir. <br />Daily water product.ion, maximum supply rate, peak consump- <br />tion and tile like are not considered aJ:9licable to Hourglass <br />Dam rehabilitat.ion. <br /> <br />(3) <br /> <br />c. Ground~ter Su=lv. Ground~atersupply is not considered to be <br />, , applicable. <br /> <br />d. <br /> <br />W;}ter'!l.i~ht..<; . <br />, ' <br /> <br />(1) <br /> <br />Effect.ive water right.s and permits, inclu:ii:1g dates of <br />orioritv will be' 'included. Their effect. on availability of <br />present- and future water 5U9Ply will be disC'.lSsed. <br /> <br />e. Water Utilizat.ion. Water utilization is not considered to be <br />~plicable to the Hourglass Dam rehabilitation project.. <br /> <br />f. Wat.er Qualitv. A general statement. of water quality will be <br />included. De<::.aile~ infoGlation is not considered to be appropri- <br />ate for t..'1e existing dam rehabili~tion. <br /> <br />6. Chapter V. Plan of Develooment. <br /> <br />a. P.'1vsical Plan. Several conceptual rer~bilitation plans will be <br />prepared for Hourglass Dam. These will include reservoir floor, <br />blanketi..'19, slurry wall C'-lt:OE: and seepage collect.ion. Sketch <br />desi.ans wi 11 be prepared for :,.'1e nromisina conceptual olans. Their <br />vari~us corTlp:ments will be described and t.'1e pur;x,ses to be <br />servred will be discussed. ~e operation of the existing and the <br />rehabi1it.ated cam will be described. <br /> <br />All dam ,ehabilitation plans will confoan to L~e State 2ngineer's <br />current Safety Standard <br />