My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00133
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00133
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2011 3:47:18 PM
Creation date
10/5/2006 11:37:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153633
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 91-1006
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />) <br />( I <br /> <br />) <br />( 'J <br /> <br />APPENDIX A <br /> <br />Hourglass Dam Rehabilitation <br />Feasibility Study <br /> <br />Final Plan of Study <br /> <br />OctOber 19, 1989 <br /> <br />The final plan of s~~y for the HOUrglass Dam Ra~abilitation Feasibility Study <br />follol<lS. The plan of study is organized in a~ordance with the outline star- <br />ting on-page 17 of the Colorarlo Water Conserv.adon Board's "Guidelines. dated <br />1978. <br /> <br />PARr A - GENE.~ RECUIREI-'.EN'IS ;DR ?SASIBILI'lY REFORl'S <br /> <br />1. Let~r of Transmittal.' The letter of transmittal will be prepared by the <br />City of Greeley wi::., t.'le assistance of Mc'"..all-::llingsor. &. Mocr,ilL--Inc- 'MEM.).._ <br />It will transmit the feasibility report aoo ac::ompanying oOC'JIIlents. The let- <br />ter will be signed by the designated oeicer of ::he City of Greeley. <br /> <br />2~ ResolUtion of AcolvinCl Oraanizat:.or.. :-(\,~ f~a"ihility report will be accom- <br />panied by an 3p9ropriate City of Greeley resolu:::.on. It will include: <br /> <br />a. <br />b. <br /> <br />c. <br />d. <br /> <br />l\mounc.oftocal estimated project cos::. <br />AIrouritof applicant' Scan tr Thueion. <br />Amoune of st.ar.e financial assistance requeSted <br />l\moun::of loans and grants from oc.'1er, sources, if anY. <br />--, .. <br />Lengc., of repayment geriod in years (not to exceed 40 years). <br /> <br />e. <br /> <br />3. Report of Ineeres::ed Aaencies. Po::e!ltiaEy ineeres::ed agencies will be <br />contacced early in ::..,e Study. Copies of t:Je draft feasibility repor:: will be <br />supplied co them as required, and Co pi"., of ':!1,~Lr n~[Xlrts and letters will be <br />included in the application. <br /> <br />The Hourglass Dam Study is primar:ly ineended to provide increased <br />Safety and operaeing ef:iCien~! of an exist:.ng dam. It is a existing <br />Single pur?Ose municipal and i~d~trial water supp\y faci:ity. <br /> <br />PARr B - <XJTLINE FOR ."::AS:LBILI':"! REPORTS <br /> <br />1. Prefacinq "Iater:.al. ':'he prefaCing material will include t:Je following. <br /> <br />a. Ti tIe Page <br />b. Letter of ~ransmittal <br />c. Resolution of City of Greeley <br />d. 'Table of Content.s <br />e. Li~t of maps and exhibits <br />f. Project Summary. Tb~ br~pE :es~~ of the re?Ort contents will be <br />in the a;:s>roved sample :ocm. <br /> <br />APP~~~D::': .; <br />
The URL can be used to link to this page
Your browser does not support the video tag.