My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00131
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:08 AM
Creation date
10/5/2006 11:37:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153171
Contractor Name
Rangely, Town of
Contract Type
Grant
Water District
0
County
Rio Blanco
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I:"rm {,.'\(".n2A <br /> <br />__ _____~j7f-0/ <br />pH'.\. .,FN I OI~ ,\(;I.....~( Y N\'~1I11:1{ <br />~._34::.Q4-DlJ. ~_ ~ ~___:__,~:.. <br />&'ON'[ RA('"!" IHHJllr';(; i'\l,:.\IBlH' . <br />, 5418 " <br />._~--,-- <br /> <br />$4,500.00 <br /> <br />CONTRACT <br /> <br />THIS CONTRACT, made thIs i l)t-n ~ay of lImp 197-8, bv and between Ihe <br />State of Colorado for the llse and benefit of the Department of" Natural Resources .' <br />. (Colorado Water Conservation RORrd) <br />hereinafter.referred to as the State, and '2 Wright-McLaughlin .Engineers. <br />'?6.?0' Alr.nrr Strpp.t.,. DpTIvprl r:olor."ldo, RO?11 <br />herei'nafter referred 10 as the contractor, ' <br /> <br />. WHEREAS, authority exists ill the Law and Funds hilve been budgeted, appropriated and otherwise made <br />a~'ailable and a sufficienl unencumhered bahmte thereof remains avaik1ble for pa\'ment in Fund Number400R <br />G/L Account Number 1)2077. . Conlract Encumbrance N'umberC11i'=l1 71, : ;nd <br /> <br />WHEREAS. required :lp]lto\'al. c1eanlllcc and coordinntion has been accomplished from and with appropriate <br />.agenci.es: and <br /> <br />WHEREAS, "pursuant to the provisions of 37-60-121(2), CRS 1973, as <br />amended, the Colorado Water Conseryation Board :may allocate to any <br />project constructed by it such amounts as may be determined by it for <br />investigating and inspecting such project, in:, ad~ition to the amount <br />allocated for actual, corts truction; and <br /> <br />WHEREAS, the Board has constructed a project for the Town of <br />Rangely, which project, 'according to 'the Town Council, .is not operating <br />~atisfactorily; and <br /> <br />WHEREAS, the Board desires to inspect and investiga~e the. operation <br />of said'project; and <br /> <br />WHEREAS, the Contractor is a professional engineering firm with <br />specific experience in' the field of municipal water supply systems; and <br /> <br />WHEREAS, the Contractor is an independent Contractor and as such <br />.is no~ entitled to ~ny benefits of the state' personnel system; <br /> <br />NOW THEREFORE, it is hereby agreed that <br /> <br />I. '4That in consideration of the ,payments to be made to' the <br />Contractor by the State as hereinafter 'set forth, the Contractor agrees <br />to perform the following services for the State: <br /> <br />a. Review the design drawings on the Rangely water treat- <br />ment plant (including appurtenances) and the diversion point <br />for said plant from the White River, make field inspections <br />of'said treatment plant and diversion structure, review water <br />quality data of ,the influent an~d effluent, review plant <br />production data. and such other pertinent' data as' may' be ap'pli- <br />cable to the satisfactory operation of the Rangely, municipal <br />water supply system, conduct such plant tests as may be <br />required, discuss any apparent problems'with the Town of <br />
The URL can be used to link to this page
Your browser does not support the video tag.