My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00130
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:08 AM
Creation date
10/5/2006 11:37:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153382
Contractor Name
Fruita, City of
Contract Type
Loan
Water District
0
County
Mesa
Bill Number
SB 81-439
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\ <br />\ <br />I <br />i <br /> <br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />1. <br /> <br />Board dpproval of engineering firm and engineering <br />agreement between engIneering firm and project sponsor. <br /> <br />z. <br /> <br />PreparatIon of detailed plans and specifIcations for <br />authorIzed projects by consulting engineering firm. <br /> <br />3. <br /> <br />ApprBval of detaIled plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must also be approved by State Engineer's <br />office). <br /> <br />4. Board staff approvai of bidding for the project. Board <br />staff present at bid opening for construction. <br /> <br />5. Project sponsor may issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the BOdrd staff before <br />they are Issued). <br /> <br />6. Conduct a pre-construction conference. Approval of <br />construction scheduLe by Board staff. <br /> <br />7. Construction commences. The Board staff makes periodic <br />inspections during construction. Ali change orders must <br />be approved by the Board staff In advance dnd before dny <br />construction on chdnge items Cdn commence. Emergenc~ <br />Ite~s cleared by telephone. <br /> <br />8. The consulting engineer certifies that the project has <br />been completed according to approved drawings and <br />specifications and arranges for final inspection. <br /> <br />9. Final inspection and acceptance of as-built project by <br />Board std'f. <br /> <br />iO. Submittal of as-built drawings to Board staff for <br />approval and filing. <br /> <br />,', <br />, , <br /> <br />: ~ <br /> <br />r <br /> <br />'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.