Laserfiche WebLink
<br />3. Require all Subcontractors to indemnify the State and <br />the Contractor against all liability and loss, and against all <br />claims and actions based upon or acisinq out of damaqe or <br />injury, including death, to pecsons or pcoperty caused by or <br />sustained in connection with the performance of any subcontract <br />or by conditions created thereby, or based upon any violation <br />of any statute, ordinance, or regulation, and the defense of <br />any such claims or actions. <br /> <br />4. Require all Subcontractors to maintain liability <br />insurance in at least the following amounts; <br /> <br />a. For any injury to one person in any single <br />occurrence, the sum of One Hundred Fifty Thousand <br />Dollars ($150,000). <br /> <br />b. For any injury to two or more persons in any <br />single occurrence, the sum of Four Hundred Thousand <br />Dollars ($400,000). <br /> <br />Said liability insurance shall name the Contractor and <br />the State as co-insureds. No payments shall be made under this <br />contract unless a copy of a certificate of said liability <br />insurance has been filed with the Colorado Water Conservation <br />Board. <br /> <br />5. Conveyor cause title to be conveyed by warranty deed <br />to the Colorado Water Conservation Board, Department of Natural <br />Resources, State of Colorado, the following portions of the <br />proposed project facilities within thirty (30) days of their <br />completion: <br /> <br />An undivided fifty percent portion of a reinforced <br />concrete overflow diversion dam about 4 feet 8 inches <br />high, 145 feet wide, 27 feet long, with 11 feet high <br />side walls, with all necessary appurtenances, <br />including stop logs, to be located as shown in <br />Appendix A. <br /> <br />The warranty deed must be recorded by the Contractor <br />in the proper county or counties and all transfer taxes shall <br />be paid by the Contractor. <br /> <br />6. Permit periodic inspection of construction by <br />authorized representatives of the State during and after <br />construction. <br /> <br />7. Without expense to the State, manage, operate, and <br />maintain the project system continuously in an efficient and <br />economical manner, and assume all legal liability for such <br />'management, operation, and maintenance. The Contractor agrees <br />to indemnify and hold the State harmless from any liability as <br />a result of the State's ownership of the project facilities <br />identified in paraqraph 5 above. The Contractor shall maintain <br />qeneral liability insurance cover.ing the management, Q~eration, <br />and maintenance of the project system until it has completed <br />purchase of the project system from the State in at least the <br />following amounts: <br /> <br />a. For any fnjury to one person in any single <br />occurrence, the sum of One Hundred Fifty Thousand <br />Dollars ($150,000). <br /> <br />b. For any injury to two or more persons in any <br />single occurrence, the sum of Four Hunored Thousand <br />Dollars ($400,000). <br /> <br />Said liability insurance shall name the State as a <br />co-insured. A copy of a certificate of said liability <br /> <br />Page 2 of 7 Pages <br />