Laserfiche WebLink
<br />-@] <br />SAFECO <br /> <br />. <br /> <br />SAFECO INSURANCE COMPANY OF AMERICA <br />_ERAL INSURANCE COMPANY OF AMERICA <br />T NATIONAL INSURANCE COMPANY <br />F AMER ICA <br />HOME OFFICE: SAFECO PLAZA <br />SEATTLE, WASHINGTON salas' <br /> <br />Bond No. 5178291 <br /> <br />PERFORMANCE BOND <br />,Approved by The American Institute of Architects <br />A,I.A. Document No. A-311 February, 1970 Edition <br /> <br />KNOW ALL BY THESE PRESENTS, That we, TEZAK CONSTRUCTION CO.. INC. <br />(Here insert the name and address or legal title of Contractor) <br />1315 Royal Gorge Blvd., Canon City, CO 81212 <br /> <br />as Principal, hereinafter called Contractor, and SAFECO INSURANCE COMPANY OF AMERICA, a Washington Corpora- <br /> <br />tion of Seattle, Washington, as Surety, hereinafter called Surety, are held and firmly bound unto San Luis Valley <br />. <br /> <br />Irrigation System c/o Colorado Water Conserva~ion Board, 1700 Lincoln!St. <br /> <br />Suite 2750, Denver, CO 80203 <br />(Here insert the name and address or legal title of Owner) <br /> <br />~~: <br />- - <br /> <br />as Obligee, hereinafter called Owner, in the amount of ONE HUNDRED THOUSAND AND <br /> <br />~::::-: <br />~/~, <br />" .'- <br />. J. <br />NO/lOO----~--~~--- <br /> <br />----------------------------------------------------- Dollars ($ 100,000.00--::'-- ,\ <br />. , }I <br />for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors ,and <br /> <br />assigns jointly and severally, firmly by these presents, <br /> <br />WHEREAS, Contractor has by written agreement dated <br /> <br />12~,,-"-, <I <br /> <br />, 19~ entered into a Contract <br /> <br />with Owner for <br /> <br />Coffer Dam at Rio Grande Reservoir <br /> <br />in accordance with Drawings and Specifications prepared by <br /> <br />(Here insert full name and address or legal title of Architect) <br />which Contract is by reference made a part hereof, and is hereinafter referred to as the Contract. <br /> <br />NOW. THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, That, if Contractor shall promptly and <br />faithfully perform said Contract, then this obligation shall be null and void; otherwise it shall remain in full force and <br />effect. <br /> <br />The Surety hereby waives notice of any alteration or extension of time made by the Owner. <br /> <br />(continued on reverse side) <br /> <br />5-1219 Rl B/77 <br /> <br />Exhibit 1 <br /> <br />PRINTED IN U.S.A. <br />