My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00127
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00127
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:20:26 AM
Creation date
10/5/2006 11:36:58 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153478
Contractor Name
San Luis Valley Irrigation District
Contract Type
Loan
Water District
20
County
Hinsdale
Bill Number
SB 86-27
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />AGREEMENT <br /> <br />THIS AGREEMENT is dated as of the 8th day of October in <br />the year 1986 by and between the San Luis Valley Irrigation <br />District (hereinafter called OWNER) and Tezak Construction <br />Company, Inc. (hereinafter called CONTRACTOR). <br /> <br />OWNER and CONTRACTOR, in consideration of the mutual <br />covenants hereinafter set forth, agree as follows: <br /> <br />1. WORK. <br /> <br />CONTRACTOR shall complete all Work as directed by Harza <br />Engineering Company (hereinafter called the ENGINEER) for <br />construction of an earth cofferdam and concrete control <br />structure at Rio Grande Reservoir. CONTRACTOR shall install <br />3 sluice gates to be furnished by the OWNER. The Work is <br />generally as shown on the sketch attached to this Agreement. <br /> <br />2. ENGINEER. <br /> <br />The Project has been designed by Harza Engineering <br />Company which will assume all duties and responsibilities and <br />will have the rights and authority of ENGINEER in the <br />Contract Documents in connection with completion of the Work <br />in accordance with the Contract Documents. <br /> <br />3. CONTRACT TIME. <br /> <br />The Work shall be completed by October 29, 1986. Time <br />is of the essence in completing the cofferdam. The <br />CONTRACTOR shall mobilize at the site as soon as possible and <br />execute the work to completion. <br /> <br />4. CONTRACT PRICE. <br /> <br />OWNER shall pay CONTRACTOR for performance of the <br />Work in accordance with the terms outlined in the <br />CONTRACTOR's letter dated October 4, 1986 attached to the <br />Agreement and made a part thereof as Exhibit A, except that <br />item 5, Embankment shall be 1750 cubic yards at 9.50jcubic <br />yard for a total of $16,625. It is understood that the final <br />cost on items 1, 2, and 5 will be based upon the settlement <br />price times the quantities actually used. <br /> <br />5. PAYMENT PROCEDURES. <br /> <br />CONTRACTOR shall submit a single Application for Payment <br />to the ENGINEER for review and approval upon completion of <br />the Work. The Application for Payment will be processed by <br />ENGINEER. Upon completion and acceptance of the Work OWNER <br /> <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.