My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153726 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153726 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:30:42 AM
Creation date
10/5/2006 11:36:54 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153726
Contractor Name
Tremont Mutual Ditch Company
Contract Type
Loan
Water District
1
County
Morgan
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TREMONT MUTUAL DITCH COMPANY <br /> <br />Costs to repair 1995 flood damage to headgate and ditch: <br />PAID INVOICES: <br /> <br />6/13-14/95 Continental Energy Services <br />Cat, truck and operator to repair ditch banks <br />6/14/95 Ransom Boone Excavating <br />Repair hole in ditch from washout <br />6/20/95 AI England <br />Backhoe to repair washed out ditch <br />8/2 & 11/95 Otis Cordley <br />Hauling rip-rap to river headgate <br />8/2,3, &11/95 Ransom Boone Excavating <br />Load concrete, backfill washout, close channel <br />8/9/95 Big uR" Manufacturing <br />24'60" 16 ga spiral pipe <br />8/16/95 Continental Energy Services <br />Backhoe to repair leak at check <br />9/1/95 Dom Ready Mix Corp <br />Hauling rip-rap to river headgate <br />11/22 -12/24/95 Ade Loomis <br />Redig both diversion ditches with track hoe, <br />removed old structure <br />3/18/96 Big "R" Manufacturing <br />20'60" spiral steel pipe and band <br />TOTAL PAID <br /> <br />UNPAID INVOICES: <br /> <br />$ 600.00 <br /> 722.50 <br /> 420.00 <br /> 1,047.50 <br /> 2,062.50 <br /> 717.41 <br /> 275.00 <br /> 633.45 <br /> 6,965.00 <br /> 668.47 <br />$ 14,1ll.83 <br /> <br />3/12/% Big "R" Manufacturing $ 1,711.02 <br /> Sheet Piling <br />3/14/96 Jack Odor Engineering Services 320.00 <br /> CAD work - blue prints <br />3/23/96 Willard Reed Lumber Company 875.53 <br /> 3 x 12 boards <br />3/31/96 Winograd's Steel and Supply 113.82 <br /> Steel beam <br />3/96 Bart Woodward 42.58 <br /> Miscellaneous out-<lf-pocket expenses <br />3/31/96 Builder's Aggregate 110.00 <br /> Truck rental - hauling rip-rap <br />4/1/96 Mohrlang Manufacturing 613.31 <br /> Misc. steel pieces and hydraulic cylinder <br />4/2/96 Ransom Boone Excavating 363.00 <br /> Removing sand, replacing hydraulic lines, <br /> de-watering (10% share) <br />4/2/96 Ransom Boone Excavating 20,915.00 <br /> Building new ditch and head structure in river <br />4/10/96 Bill R Baker Cement Contractor 14,716.25 <br /> Concrete work on new head structure <br /> TOTAL UNPAID $ 39,780.51 <br /> <br />ESTIMATED ADDmONAL COSTS: <br /> <br />5/% <br />8/% <br /> <br />Hauling and placing rip-rap on new diversion <br />structure in river <br />Interest on temporary construction loan <br />TOTAL ESTIMATED <br /> <br />GRAND TOTAL <br /> <br />$ 6,000.00 <br /> <br />1 ,000.00 <br />$ 7,000.00 <br /> <br />$ 60,892.34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.