Laserfiche WebLink
<br />Institutional Considerations <br /> <br />I <br />I <br />I <br /> <br />The TMDC already has approval from the CWCB to borrow $27,000 <br />from the Small Project Loan Account. The increased loan amount <br />of $45,000 must be approved at the May 14, 1996 CWCB meeting. <br />The loan from the CWCB is contingent upon the successful <br />negotiation of a contract between the CWCB and the TMDC. <br /> <br />I <br />I <br />I <br /> <br />The TMDC may need to obtain an approving vote of the shareholders <br />to contract for the loan. <br /> <br />Opinion of Feasibility <br /> <br />The selected alternative is technically and financially feasible. <br />There are no significant roadblocks which would keep the TMDC <br />from successfully completing this project. <br /> <br />~::!:~~rer / <br /> <br />5/l~6 <br /> <br />Date <br /> <br />I <br />I <br />I <br /> <br />Signatures of those who assisted in the preparation of this <br />report: <br /> <br />~1ft!);di)~~ / <br />C, roject Coordin pr <br /> <br />tt1p( <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />/ <br /> <br />~V~b <br /> <br />te <br /> <br />Feasibility of the Repair of the <br />Tremont Mutual Ditch Company Headgate <br />April 19, 1996 <br /> <br />8 <br /> <br />I <br />I <br />I <br />1 <br />