My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00124
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:58 AM
Creation date
10/5/2006 11:36:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153394
Contractor Name
Wellington, Town of
Contract Type
Loan
Water District
1
County
Larimer
Bill Number
SB 81-439
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ENVIRoaUIP - DOUGAN <br />A JOI NT VENTURE <br />2100 South Valenlia Streel (303) 752-1000 <br />D..mver, Colorado 80231 <br /> <br />',. <br /> <br />July 6, 1982 <br /> <br />Municipal Utilities Services, Inc. <br />5500 So~th Syracuse Circle, Suite l09 <br />Englewood, Colorado 801ll <br /> <br />RE: Proposal for Construction of Wellington Water Treatment Plant <br /> <br />Gentlemen: <br /> <br />We propose to design, build and guarantee the performance of a <br />water treatment plant to be leased by Municipal Utilities Services, <br />Inc., to the Town'.of Wellington, Colorado. <br /> <br />The plant will be designed for a flow rate of 750,000 gallons per <br />day with a peak flow rate of 900,000 per day, expandable to <br />l,500,000 gallons per day. The plant will be designed by Taranto, <br />Stanton and Tagge, Consulting Engineers, and will be constructed <br />in accordance with their plans and specifications. The plant will <br />further comply with the Design Summary attached and with the <br />Proposed Basic Treatment Process and Equipment tabulation, also <br />attached. <br /> <br />The design ~;ork will commence immeidately upon receipt of Notice <br />to Proceed and will be substantially complete within 270 calendar <br />days in accordance with the terms of the proposed Agreement, which <br />is attached. Pay conditions, bonds,and warranties will be in <br />accordance with the proposed Agreement. <br /> <br />We propose to perform the work for the lump sum of $ <br /> <br />We trust our proposal meets with your approval, and we look forward <br />to working with you on this project. <br /> <br />Yours truly, <br /> <br />ENVIROQUIP-DOUGAN <br /> <br />James M. Dougan, President <br />Robert Dougan Construction Company <br /> <br />Enviroquip, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.