My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00124
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:58 AM
Creation date
10/5/2006 11:36:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153394
Contractor Name
Wellington, Town of
Contract Type
Loan
Water District
1
County
Larimer
Bill Number
SB 81-439
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE OF CONTENTS <br /> <br />Project Up:late <br /> <br />Alternatives <br /> <br />1. Eko Source <br /> <br />II. North Poudre Source <br />Background <br />Water Quality <br />Description of Facilities <br />North poudre Negotiations <br />Econanic Analysis <br /> <br />Conclusions and Reccmrendations <br /> <br />Appendix A - Fire Flow Analysis <br /> <br />Appendix B - North Poudre Agreerrent <br /> <br />Appendix C - Water TreatIrent Plant Considerations <br />Design Surmary <br />Corrparison of Water Treatrrent Plant Costs <br />Plant Design Life <br />Projected Operation and Maintenance Expenses <br />Preliminary Agreerrent for Water Treatrrent Plant <br /> <br />Appendix D - Financial Considerations <br />Recap of Project Costs <br />\'lellington WAter Departrrent 1982 Budget <br />Water Tap Count <br /> <br />Appendix E - Engineering Agreerrent <br />~ero regarding FHA Letter <br /> <br />. <br />,A <br />
The URL can be used to link to this page
Your browser does not support the video tag.