My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00123
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2010 11:49:45 AM
Creation date
10/5/2006 11:36:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153448
Contractor Name
Colorado River Water Conservation District
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-. <br /> <br />TASK NO.: 10 <br />RFP CROSS-REFERENCE: <br />Step 3, Item (2) <br /> <br />STAFF MEMBERS RESPONSIBLE: <br />Alternatives Identification and <br />Evaluation Specialist <br />Preliminary Design and Cost <br />Estimates Specialist <br /> <br />TASK TITLE: <br /> <br />Evaluation of Alternative Surface Creek Projects with Transbasin Diversions <br />from North Fork Water Conservancy District. <br /> <br />RATIONALE: <br /> <br />Using data compiled and results from Task Nos. 2 through 8, combining both a <br />new Surface Creek replacement storage reservoir and transbasin diversion <br />system from the North Fork Water Conservancy District, alternative project <br />configurations can be formulated and evaluated to determine their compara- <br />tive costs and feasibility. <br /> <br />METHOOOLOGY: <br /> <br />1. Formulate alternative configurations of the project encompassing the range <br />of practical combinations of various sizes of Cactus Park Reservoir, or other <br />selected replacement reservoir in the Surface Creek basin, and the transbasin <br />import system from the North Fork Water Conservancy District. <br /> <br />2. Prepare appraisal level cost estimates of the selected alternative project <br />plans, and evaluate the alternatives with regard to relative feasibility and <br />practicality. <br /> <br />PRODUCTS: <br /> <br />1. Descriptions of alternative project plans using both Surface Creek supplies <br />obtained by means of improved system management and the GMWCD <br />conditional rights and water imported from the North Fork Water Con- <br />servancy District by means of enlargement and extension of the Overland <br />Ditch and Reservoir system. <br /> <br />2. Tabulation of the comparative costs and feasibility of the alternative project <br />plans. <br /> <br />1I-18 <br /> <br />Revised 9/23/1985 <br />
The URL can be used to link to this page
Your browser does not support the video tag.