My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00122
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2010 3:54:01 PM
Creation date
10/5/2006 11:36:49 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150100
Contractor Name
East Dillon Water District
Contract Type
Loan
Water District
5
County
Summit
Bill Number
Bill 02-1152
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />BORROWER: EAST DillON WATER DISTRICT <br />Contract No. C150100 <br />Loan Amount $2,550,000 <br /> <br />Agency Name: Water Conservation Board <br />Agency Number PDA <br />Routing Number 03 PDA oD03f2, <br /> <br />LOAN <br /> <br />CONTRACT <br /> <br />THIS CONTRACT, made this November 10, 2002, by and between the State of <br />Colorado for the use and benefit of the Department of Natural Resources, Colorado Water <br />Conservation Board ("CWCB"), and the East Dillon Water District, a Colorado special <br />district, 101 S. 7th Street, P.O. Box 627, Frisco, CO 80443-0627 ("BORROWER"). <br /> <br />FACTUAL RECITALS <br /> <br />1. Authority exists in the law, and funds have been budgeted, appropriated and otherwise <br />made available and a sufficient unencumbered balance thereof remains available for <br />payment as follow: Contract Encumbrance No. C150100, Fund Number 424, <br />Organization YYYV, Appropriation Code L02, GBL E100, Program WTRC, Object <br />Code 5560, Reporting Category 0100. <br /> <br />2. Required approval, clearance, and coordination have been accomplished from and with <br />appropriate agencies. <br /> <br />3. The PROJECT Summary, attached as Appendix 1 and incorporated herein, contains <br />BORROWER Information (Section 1), the PROJECT Description (Section 2), CWCB's <br />authority for making this loan (Section 3), and CWCB Approval and Legislative <br />Authorization (Section 4). <br /> <br />4. The CWCB now desires, by this contract, to loan money to the BORROWER for this <br />PROJECT upon mutually agreeable terms and conditions. <br /> <br />THEREFORE, in consideration of the mutual and dependent covenants contained <br />herein, the parties agree as follows: <br /> <br />A. LOAN PROVISIONS <br /> <br />1. Promissory Note Provisions. The CWCB agrees to loan to the BORROWER an <br />amount not to exceed the LOAN AMOUNT and the BORROWER agrees to repay the loan in <br />accordance with the terms as set forth in the Promissory Note, in the form attached <br />hereto as Appendix 2 and incorporated herein. The Promissory Note shall identify the <br />LOAN AMOUNT. If the amount of loan funds disbursed by the CWeB to the BORROWER <br />differs from the LOAN AMOUNT, the Parties agree to amend this contract to revise the <br />LOAN AMOUNT. <br /> <br />2. Interest Prior to PROJECT Completion. As the loan funds are disbursed by the CWCB <br />to the BORROWER, interest shall accrue at the rate set by the CWCB for this loan. The <br />CWCB shall calculate the amount of the interest that accrued prior to substantial <br />completion of the PROJECT and notify BORROWER of such amount. The BORROWER <br />shall repay that amount to the CWCB either within ten (10) days from the date of <br />notification from the CWCB, or, at the CWCB's discretion, said interest shall be <br />deducted from the final disbursement of loan funds that the CWCB makes to the <br />BORROWER. <br /> <br />Page 1 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.