My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153629 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153629 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:25:18 AM
Creation date
10/5/2006 11:36:35 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153629
Contractor Name
Colorado River Water Conservation District, The
Contract Type
Loan
Water District
50
County
Grand
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I I <br />I <br /> <br />~MORRISON-KNUDSEN ENGINEERS, INC. <br />~ A MORRISON KNUDSEN COMPANY <br /> <br />HEADQUARTERS OFFICE <br />180 HOWARD STREET <br />SAN FRANCISCO, CALIFORNIA USA. 94105 <br />TELEX (WUI) 677058. (In) 470040, (ReA) 278362, (WUD) 34376 <br />PHONE (415}442-7300 <br /> <br />5044-71 0 <br /> <br />5 January 1987 <br /> <br />Colorado River Water Conservation District <br />Mid-Continent Building, Suite 204 <br />P.O. Box 1120 <br />G1enwood Springs, CO 81602 <br /> <br />Attention: Mr. David Merritt <br /> <br />Subject: Rock Creek Project, Phase I <br />Feasibility Study <br /> <br />Dear Dave: <br /> <br />We are pleased to submit twenty (20) copies of the final report entitled <br />"Rock Creek Project - Report on Feasibility Investigations," Volume I - <br />Report, May 1986, and ten (10) copies of Volume II - Apendices. The <br />report has been finalized taking into account the River District's review <br />co~nents and suggestions on the draft report and including internal review <br />comments and minor editorial changes. Elements of the supplemental <br />materials investigation have been integrated into the final report and <br />updated costs on the Rock Creek Project and implementation schedules have <br />been included. <br /> <br />The report is submitted in accordance with the provisions of our Agreement <br />dated 15 August 1985 and presents the results of the investigations and <br />studies performed in accordance with the specified scope of work under <br />Tasks 1 through 12 of the Agreement and the May 1986 Supplemental Work, <br />Amendment No.1. <br /> <br />Very truly yours, <br /> <br />h~~ A-/r~ <br /> <br />Eric B. Kollgaard <br />Project Manager <br /> <br />EBK:rrw <br /> <br />Encl.: Twenty (20) Copies of Volume I - Report <br />Ten (10) Copies of Volume II - Appendices <br />
The URL can be used to link to this page
Your browser does not support the video tag.