My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00118
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:13:19 AM
Creation date
10/5/2006 11:36:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153670B
Contractor Name
Ute Water Conservancy District
Contract Type
Loan
Water District
72
Bill Number
SB 88-30
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />.. <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />.. <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />(' <br /> <br />I <br /> <br />. <br /> <br />Chapter IV - Raw Water Transmission Evaluation <br /> <br /> <br />A. Alternate Means of Delivery <br /> <br /> <br />1. Pipeline - Replacement/Enlargement of Existing <br /> <br /> <br />2. Pipeline and Storage - Plateau Pumping Station <br /> <br /> <br />3. Colorado River Pumping Station <br /> <br /> <br />4. Increased Capacity Via In1ine Pumping Station(s) <br /> <br /> <br />5. No Project <br /> <br /> <br />B. Alternative Evaluation <br /> <br /> <br />1. Route selection - Coordinated with Highway Department <br /> <br /> <br />2. Aerial mapping <br /> <br />3. Field Surveys / Right-Of-Way <br /> <br /> <br />4. Geotechnical Investigations <br /> <br /> <br />5. Preliminary Cost Estimates <br /> <br /> <br />6. Evaluation and Recommendation <br /> <br />Chapter V <br /> <br />- Preliminary Design <br /> <br /> <br />Feasibility-Level Design <br /> <br /> <br />1. Hydraulics and pipe and pump sizing <br /> <br /> <br />a. Present Treatment Plant Capacity (22 MGD) <br /> <br />b. Ultimate Treatment Plant Capacity (42 MGD) <br /> <br /> <br />2. Pipeline profile and hydraulic gradeline <br /> <br /> <br />3. Special Structures <br /> <br /> <br />a. PRVs <br /> <br /> <br />b. Tie-ins to existing features <br /> <br /> <br />c. Creek crossings <br /> <br /> <br />4. Impact on flood plain and existing structures <br /> <br /> <br />Construction Schedule of Alternative <br /> <br />1. Optimistic <br /> <br /> <br />2. Pessimistic <br /> <br /> <br />3. Measures to ensure uninterrupted service <br /> <br />Cost Estimates of Alternative <br /> <br /> <br />1. Construction Cost <br /> <br /> <br />2. Operation and Maintenance Cost <br /> <br /> <br />Financial Evaluation of Alternative <br /> <br /> <br />1. Financial Program for Construction Cost <br /> <br /> <br />2. Cost and Revenue Projections <br /> <br />A. <br /> <br />B. <br /> <br />C. <br /> <br />D. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.