Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />bottom width of 168 feet. The emergency spillway will have 2H:1V sideslopes and <br />a top width of 194 feet. This alternative is the same as Alternative #1 except <br />that the design flow is 1/2 of the PMF instead of the full PMF. <br /> <br />Modifications to the existing dam are the same as for Alternative #1 except that <br />the emergency spi 11 way wil 1 be 168 feet wide. Add it iona 1 embankment on the <br />downstream slope of the dam is required to provide stability Riprap replacement <br />is required on the upstream face and along the emergency spillway slope adjacent <br />to the dam. The concrete grade beam along the emergency spillway crest is also <br />required, although it will be much smaller due to the lesser spillway requirements. <br /> <br />Alternative 14 - Alternative #4 is the same as Alternative #2 except the modifica- <br />tions to the embankment and spillway are designed for 1/2 of the PMF instead of <br />the full PMF. Figure 5.6 presents the embankment modifications for this alterna- <br />tive. For Alternative #4, the embankment will be raised 5.5-feet and extended <br />along the downstream slope at 2.25H:1V to provide additional stability. The <br />proposed emergency spillway will have a bottom width of 42-feet and sideslopes of <br />2H:1V. The north slope adjacent to the dam embankment will be ripraped as well <br />as the upstream face of the dam. A concrete grade beam will be provided to <br />stabil ize the emergency spillway crest and to protect against erosion when the <br />spillway operates. As with Alternative #2, the 20-inch outlet decant pipe will <br />be extended to the toe of the new embankment section. <br /> <br />Each of the above alternatives was reviewed and prioritized based on a combination <br />of; estimated cost, dam and appurtenant structure safety, technical feasibil ity <br />and compliance with regulatory agency requirements. Ordinarily one of the major <br />cost factors in a dam is the design frequency and thus the size of the emergency <br />spillway. At present, the State Engineer requires that an embankment such as the <br />Victor No.2 be equipped with a spillway sized to pass the probable maximum flood <br />or size the spillway based on an incremental damage analysis. We have been <br />advised that the State Engineer is considering several hydrologic criteria for <br />inclusion in the rules and regulations for dam safety and that it is 1 ikely that <br />this revised criteria will give the City the option of downsizing the emergency <br />spillway to 1/2 the PMF and that further downsizing may be justified by an <br />incremental damage analysis. A cursory review of potential flood damages down- <br /> <br />36 <br />