My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C152718 Feasibilty Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C152718 Feasibilty Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:07 AM
Creation date
10/5/2006 11:36:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153718
Contractor Name
Morgan County Quality Water District
Contract Type
Loan
Water District
0
County
Morgan
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION EIGHT <br />OPERATJNG EXPENSES <br /> <br />PAST OPERATION AND MAINTENANCE EXPENSES <br />The District has maintained good records of operating costs since inception. Until 1995 all <br />engineering expenses were allocated to operlltion and maintenance rather than being <br />apportioned between capital improvements lI11d operation and maintenance. Following in <br />Table Number 7 is a summary of past expenses with an adjustment to exclude engineering that <br />should have been allocated to capital improvements. <br /> <br />Operation and maintenance expenses, for p1JIPOSes of this discussion, have been divided into <br />pumping, and other operation and maintenance. Table Number 1 shows only other operation <br />and maintenance. <br /> <br />TABLE NUMBER 7 <br />OPERATION AND MAINTENANCE EXPENSES <br /> <br />YEAR <br /> <br />1985 <br />1986 <br />1987 <br />1988 <br />1989 <br />1990 <br />1991 <br />1992 <br />1993 <br />1994 <br />1995 <br />1996 <br />1997'" <br /> <br />'" Estimated <br /> <br />O&M <br /> <br />$256,500 <br />$241,169 <br />$248,422 <br />$287,446 <br />$275,120 <br />$262,265 <br />$269,933 <br />$290,068 <br />$327,874 <br />$338,252 <br /> <br />ENGINEERING <br />ALLOCATED <br />TO CAPITAL <br />IMPROVEMENTS <br />o <br />$18,498 <br />$8,575 <br />$47,203 <br />$13,755 <br />$3,251 <br />$0 <br />$7,127 <br />$20,836 <br />$29,825 <br /> <br />ADJUSTED <br />O&M <br /> <br />$256,500 <br />$222,671 <br />$239,847 <br />$240,243 <br />$261,365 <br />$259,014 <br />$269,933 <br />$282,941 <br />$307,038 <br />$308,427 <br />$320,358 <br />$349,395 <br />$349395 <br /> <br />FUTURE OPERATION AND MAINTENANCE EXPENSES <br />The a4justed O&M from Table Number 7 was plotted and extrapolated to detennine future <br />expenses. The plot is shown on Exhibit Number Nine at the back of the report. The projected <br />annual increase in costs is equal to $11,000, which is the same as the average that has been <br />experienced over the last eight years. <br /> <br />PAST PUMPING COSTS <br />Pumping costs that have been incurred over the last 13 years are shown in the following table. <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.