My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00113
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:07 AM
Creation date
10/5/2006 11:36:20 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0032X
Contractor Name
San Miguel Project USBR 1966
Contract Type
Miscellaneous
Water District
0
County
San Miguel
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />o. <br /> <br />The San Miguel Project would deplete the flow of the Colorado River <br />by an average of 85,000 acre-feet annually. This depletion would <br />be within the apportionment of consumptive use of water made to <br />Colorado by the Upper Colorado River Basin Compact of 1958 and <br />remaining for use of the State after development of its authorized <br />projects and other projects likely to be developed prior to the <br />San Miguel Project. <br /> <br />. <br /> <br />The effects of the San Miguel Project on fish and wildlife values <br />have been evaluated by the Bureau of Sport Fisheries and lvildlife. <br />Preliminary information furnished by that Bureau indicates that <br />the San Miguel Project would provide average annual fish and wild- <br />life benefits of $204,000. Of this amount $168,900 would be <br />attributable to fishing at the three project reservoir, $28,400 <br />would be associated with hunting for upland game and waterfowl and <br />trapping of fur animals, and $6,700 would be for waterfowl conservation. <br />. Values of trout fishing in the San Miguel River and mule deer hunting <br />wo~ld be decreased with no practicable means of fully mitigating the <br />losses. <br /> <br />The San Miguel River fishery between Saltado Reservoir and the <br />Colorado Cooperative Canal would be maintained by reservoir releases <br />for project purposes, including maintenance of a minimum flow. The <br />Bureau of Sport Fisheries and Wildlife found that these flows would <br />assure the perpetuation of river pools, protect aquatic vegetation <br />and invertebrate animal life, and perrr.it successful spawning and <br />rearing of fish, but on a smaller scale than under present conditions. <br />As recommended by that bureau, a river channel improvement program <br />which would include channel modifications and the development of <br />ponding areas is included in project plans. As also recommended, <br />independent control would be provided for the two segments of the <br />Radium Reservoir so that the east segment can be held at higher levels <br />for fish and wildlife, including maintenance at full stage during the <br />waterfowl mating season. In addition, a fish and wildlife managerr.ent <br />area "ould be developed on and around Radium Reservoir for administra- <br />tion by the Colorado Department of Game, Fish, and Parks. <br /> <br />The cost of specific fish and wildlife facilities is estimated at <br />$419,000, including $250,000 for river channel improvements below <br />Galtado Reservoir and $169,000 for development of the Radium fish and <br />11ildlife nrea. The annual cost of operating and ~aintaining the <br />facilities is estimated at $10,000 for the channel llcprovements and. <br />$10,700 for the fish and wildlife area. The latter cost would be <br />borne by the State or Colorado and "as therefore excluded as a project <br />cost and was deducted from the fish and wildlife benefits in <br />benefit-cost comparisons. <br /> <br />5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.