My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00112
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:14 AM
Creation date
10/5/2006 11:36:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153767
Contractor Name
River Oaks on the Roaring Fork Property Owners Association
Contract Type
Loan
Water District
38
County
Eagle
Bill Number
SB 97-008
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The Selected Project <br /> <br />The RORFPOA has selected the alternative to build an independent <br />raw water system to irrigate 7.5 acres within the service area. <br /> <br />The conceptual plan of the raw water system was prepared by Grand <br />Junction Pipe of Basalt Colorado, A copy of the conceptual plan <br />is provided in Appendix B. The NRCS has reviewed the conceptual <br />plan as to general feasibility. <br /> <br />The raw water irrigation system will divert from a well adjacent <br />to the Roaring Fork River in the vicinity of the Cox and Henry <br />Ditch. A pump station will deliver water through pipelines on <br />both sides of River Oaks Lane. Each lot will have a tap at the <br />street frontage property line. <br /> <br />Water Rights and Water Availability <br /> <br />The RORFPOA does not own water rights for this project. It plans <br />to lease raw water from the Mid Valley Metropolitan District <br />under a long term agreement. A description of water rights, and <br />a draft of the Water Rights Lease agreement are included in <br />Appendix C. <br /> <br />Cost Estimate <br /> <br />Engineering and Design <br />Construction <br /> <br />$ 2,500 <br />$31. 500 <br /> <br />Total Cost <br /> <br />$34.000 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />A detailed proposal and construction cost estimate is included in <br />Appendix B. <br /> <br />Implementation Schedule <br /> <br />Task <br /> <br />Tarqet Completion Date <br /> <br />l. <br />2. <br />3. <br />4. <br />5. <br /> <br />Complete Final Design <br />Bid the Job <br />Start Construction <br />Complete Construction <br />Project is Operational <br /> <br />4/15/97 <br />5/01/97 <br />5/15/97 <br />6/15/97 <br />7/0l/97 <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.