Laserfiche WebLink
<br />( <br /> <br />) <br /> <br />c) <br /> <br />b. consistent with both the statutory purposes of this contract and the limitations of the statutory <br />authority under which it is made, . <br /> <br />7. Casualty and eminent domain. If, at any time, durin,g the term of this contract, (a) the BORROWER'S <br />PROJECT facilities and/or property pledged as collateral for this loan, induding buildings or any portion <br />thereof, are damaged or destroyed, in whole or in part, by fire or other casualty, or (b) title to or use.Qf <br />the PROJECT facilities m any part thereof shall be taken under the exercise of the power of eminent domain, <br />the BORROWER shall cause the net proceeds of any insurance claim or condemnation award to be applied <br />to the prompt replacement, repair and restoration of the PROJECT facilities .or any portion thereof. Any net <br />proceeds remaining after such work has been completed shall be paid to the BORROWER. If the net <br />proceeds are insufficient to pay the full cost of the replacement, repair and restoration, the BORROWER shall <br />complete the work and pay any cost in excess of the net proceeds. <br /> <br />B. Captions. That the captions and headings contained in this contract are for convenience and <br />reference only and shall not be construed so as to define or limit the terms or provisions contracted herein. <br /> <br />9, STATE'S approval. This .contract requires review and approval of plans, specifications, and various <br />other technical and legal documents. The STATE'S review of these documents is only for the purpose .of <br />verifying BORROWER'S compliance with this contract and shall '!'Ot be construed or interpreted as a technical <br />review or approval of the actual design or construction of the.~I:'I'!OJECT. Notwithstanding any consents or <br />approvals given the BORROWER by the STATE on any suc1\:'dllcoments, BORROWER and its CONSULTANT <br />preparing any such documents shall be solely responsil:>le for the accuracy and completeness of any of the <br />construction documerlts. <br /> <br />10. Addresses for mailing; All notices, correspondence, or other documents required by this contract <br />shall be delivered or mailed to the following. addresses: <br /> <br />, <br /> <br />For the STATE: <br /> <br />For the. BORROWER: <br /> <br />Colo.rado Water Conservation Board <br />1313 Sherman Street, Room 721 <br />Denver, CO 80203 <br />Attn: William P. Stanton <br /> <br />Castle Pines North Metropolitan District <br />650 Castle Pines Drive South <br />Castle Rock, CO 80104 <br />Attn: Paul V. Dannels, Manager <br /> <br />D. Special provisions (1993 version) <br /> <br />1, Controller's approval.. This contract shall not be deemed valid until it shall have been approved by the <br />Controller of the State of Colorado or such assistant as lJe may designate. This provision is applicable to any <br />contract involving the payment of money by the STATE. <br /> <br />2. Fund availability. Financial obligations of the State of Colorado ~payable after the current fiscal year <br />are contingent upon funds for that purpose being appropriated, budgeted, and otherwise made available. <br /> <br />3. Bond requiremeot. If this contact involves the payment of more than fifty thousand dollars for the <br />construction, erection, repair, maintenance, or improvement of any building, road, bridge, viaduct, tunn'el, <br />excav.ation or other public work for this STATE, the CONTRACTOR shall, befo.re entering upon the performance <br />of any such work included in this 'contract, duly execute and deliver to the STATE officiai who will sign the <br />contract, a good and sufficient bond or other acceptable surety to be approved by said official in a penal sum <br />not less than .one-half .of the total amount payable by the terms ..of this contract. Such bond shall be duly <br />executed by a qualified corporate surety conditioned upon the faithful performance of the contract and in <br />addition, shall provide that if the CONTRACTOR or his subcontractors fail to duly pay for any labor, materials, <br />team hire, sustenance, .provisions, provender or other supplies used or consumed by such CONTRACTOR or his <br />subcontractor in performam:e of the work contracted to be done or fails to pay any person who supplies rental <br /> <br />CASTLE PINES NORTH METRO DISTRICT <br /> <br />Pageeof11 <br /> <br />LOAN CONTRACT <br />